Orange County NC Website
• Roadsitle buffering antl setbacks providetl along 8altlwin antl New Sharon Church Roads <br />• gverage of 1.18 acres of in-lot open space per Ict. <br />• Minimum to actual density mdo (MTADR)=3.6]. <br />• 100 foot building setback along perimeter required under flexible development is provided <br />• Homeowners Association documents eletl for maintenance of open space antl buffer <br />WatarSewer: <br />• Intlividual wells. <br />• Indivitlual septic systems. <br />Recreation: <br />• Northam District Park (91 lots X $455 = $61 405). <br />• No tledication is wanantetl because no county recreation or rewume area has been <br />itlanlifletl at [his time. The payment-in-lieu option Is viable. <br />Aaencv Comments: <br />• Comments aXachetl from NGDOT, Environmental Health and Emergency Management. <br />Development Proeess. SeM1edule and Aclign <br />Planning Board: <br />• Flrst Acton: Concept Plen approved by the Planning Boartl April 4, 2001 with the <br />following contlltions: <br />1. The intersection and road alignments on the Preliminary Plan shell meet NCDOT <br />stantlaMS. <br />2. Homeowners Association documents shall be submitted with the preliminary <br />plan that provitle for maintenance of the Open Space. <br />3. A note shall be placed on the plan stating that the proposetl northern by-pass. <br />which la part of [he atloptetl Hillsborough Thoroughfare Plan, may be located <br />near the nddhern properly line of this development. The precise alignment has <br />not bean detenninetl prior to review of this plat. <br />Preliminary Plan atltlresses conditions of approval of the Concept Plan. The subtlivision tlesign <br />has not changed from the Concept Plan. <br />• Second ACtlon: <br />1. The Planning Boartl in a unanimous vote recommendetl approval October 3, <br />zogt. <br />• Third Action; Board of County Commissioners, on November 19, 2901, tabletl [Ile <br />subdivision and direcmtl staff and tlevelaper to atltlress the siz issues on page 1 IN <br />[M1is abstract. <br />• Foukh Action: 8000 to make decision <br />Optons'. <br />1. The Boartl shall consider [he application within a reasonable amount of time. <br />2. Dudng deliberations antl consitleration of the application Ne Boartl may tlefer <br />consideration at any point to pursue atltlitional analysis antl review. <br />3. If Preliminary Plan ie approved by the County Commissioners the apphcan[ shall <br />have one (i) year to prepare antl fJe a Final Plat or to request eons-year <br />eMension from the Planning Director. <br />FINANCIAL IMPACT: Fiscal Impact Analysis inclutletl as an attachment. <br />RECOMMENDATION(S): Administration Approval of the Preliminary Plan in accortlance with <br />the atlachetl Resolution of Approval. <br />Planning Board Approval, in accortlance with the adached Resolution <br />of Approval. <br />Planning Staff Aopmvel. in accortlance with the attached Resolution <br />