Orange County NC Website
43 <br />b_ Birdsong Subdivision Preliminary Plan <br />The Board considered a preliminary plan for Me proposed BiMSOng subdivision. <br />Craig Benedict made this presentation. <br />The subdivision is a 5421 -acre matt The original most was 05.39 acres, 31 of Mich <br />r subdivided into three Iota of just over 10 acres each through the exempt process. There <br />will be 26 single-family residential lots on Me conservation- cluster flexible development option. <br />The average lot size is 123 acres and Me proposed open space is W% of the site The site Is <br />located on the south side of Little River Church Road between Walnut Grove Church Road and <br />NO 57 In Cedar Grove Township. Payment-in-lieu fees of$1183o will be collected. Planning <br />staff recommends approval because It is In accordance with the flexible development plan. <br />Commissioner Carey asked about Pe blue area on Pe map and Craig Beneditl said <br />that it was a flooded area. <br />Commissioner Carey asked about the stub out at the end of the cul -de -sac and rf it <br />would be developed. Craig Benedict said Pat the staff was looking into a 50 -foot easement <br />reservation that would allow Me continuation of the cut de-s b; In the other subdivision. In the <br />vent that the 50.fcot easement is not available, this stub out would all for access to a large <br />portion of undeveloped properties to the south and southwest. <br />Commissioner Jacobs said that for noticed on the previous subdivision , Duck <br />Lending, that there was information about building the mad to DOT standards and Pe mad in <br />this subdivision is being built W DOT minor local standards. He asked about thediffdence and <br />Craig Beneditl said Mat a different planner mote the storable and the roads were Pe some <br />Commissioner Jacobs asked about certain sized subdivisions that require community <br />hoarding. He asked about the threshold. Geoffrey Gledhill said Pat this was a standard that <br />the County does not have. The County has only done this in planned development spacial use <br />projects and it Is not a requirement of the subdivision regulations. <br />Commissioner Jambs asked that staff look into whether Mere should be some kind <br />of automatic point at which it would require a more comprehensive look at requiring recycling <br />He would also like for staff to look into whether there should be a standard for Me distance from <br />an access point Pat would lead to the open space. <br />Commissioner Jacobs asked about the acre of recreation space. <br />Ella Batoull, developer of this project said Mat he could have made to lots larger, <br />burns would have had to use the pond and the wetlands. He was against possible <br />comtaminationofthepond. He addressed Me emergency management letter and the three <br />concerns (egres aingress, 911 staffing, and fire protection). He said Pat he dedicated % acre <br />from the cimlaforafuNre road if McMerownern debts td do fit. Heairosaiddhothis <br />subdivision would =am mom tax revenue for the government so mote 911 men could be been <br />Regarding Me fire protection, he said that the pond has about 70 million gallons of water of <br />Mich half could be used for fire protection. Regarding Me recreation, he had thought about <br />providing a litlle extra space in addition to the colors for a passible playground. <br />Commissioner Jambs made reference to the cut -de -sac and asked about Me status <br />of Me investigation of the K had easement. He asked if this should be finalized before Me <br />subdivision is approved. Craig Beneditl said that Me stub out to undeveloped properties would <br />be a good Has The investigation to the adjacent subdivision is a separate Issue and should be <br />investigated Independently. <br />