Browse
Search
Agenda 11-16-2021; 8-c - Approval of Interlocal Agreement Renewal and Master Plan - Little River Regional Park and Natural Area
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 11-16-2021 Virtual Business Meeting
>
Agenda 11-16-2021; 8-c - Approval of Interlocal Agreement Renewal and Master Plan - Little River Regional Park and Natural Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2021 4:57:03 PM
Creation date
11/12/2021 2:46:08 PM
Metadata
Fields
Template:
BOCC
Date
11/16/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-c
Document Relationships
Minutes 11-16-2021 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2021
OTHER-2021-054 Interlocal Agreement Little River Regional Park
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37 <br /> Increase Areas of Pollinator Habitats , % <br /> The protection and expansion of pollinator habitat is a gi w <br /> national and even global issue.Pollinator species sus- `� e 4" � <br /> •a . J <br /> tain the environment and are critical to food supplies. x <br /> Orange County has set a goal of increasing pollinator <br /> habitat within its parks and open spaces,as well as en- c • ' <br /> couraging habitat along roadsides and on private lands. " <br /> Little River Park,with its natural resources and open <br /> spaces, lends itself to being a place where pollinator <br /> habitats may be expanded and introduced.The current <br /> pollinator garden is a good start and a popular edu- <br /> cational component, but more is possible at the park. *4 <br /> Additional areas of pollinator-friendly habitats could be <br /> researched for future development. <br /> Addition of a"Natural Playground" <br /> Over the past decade, research indicates that children - "A <br /> benefit greatly from playing and learning in nature. Needed renovations include, but are not limited to: <br /> Natural play areas often engage the mind and allow . Driveway resurfacing (currently needed) <br /> children to use their imaginations more,and cooperate <br /> more in play.These types of play areas reduce symp- • Buildings (equipment shed,etc.) <br /> toms of attention deficit and depression,and many • Playground replacement(within the next 5 years) <br /> experts note that access to nature for a child is akin to . Resurfacing the paved looped trail <br /> the need for good nutrition and adequate sleep. <br /> In a large natural setting,a natural play area at the park Priorities for Future Capital Improvements <br /> would be very much in keeping with the surrounding As noted in the preceding sections,a number of re- <br /> environs,and allow children to connect, play,and learn placement or new capital improvements to Little River <br /> in nature.This idea also allows the incorporation of Park will be needed in the next 10 years or more.Some <br /> the existing landscape and vegetation to bring nature of these improvements will need to be assessed and <br /> to children's daily outdoor play and learning environ- funded through the Capital Investment Plans of the two <br /> ments. counties,while other(smaller) items may be addressed <br /> The steps needed to develop such a play area at North through Annual Objectives and park management. <br /> Fork Little River could be researched and incorporated It is recommended that the two counties assess these <br /> into upcoming improvements.In many cases, natural needs as part of their respective Capital Improvement <br /> play areas are not expensive to construct. It is recom- Program,or through then Annual Objectives (and <br /> mended that the existing conventional playground be annual park budget),and schedule prioritized needs <br /> retained (and when scheduled, replaced). accordingly. <br /> Renovations of Park Infrastructure While it is not possible to provide a complete list of all <br /> Having reached the 15-year mark,some of the park priorities for future capital improvements at the park, <br /> infrastructure(including buildings)are beginning to it may be help to start with a starter list of priorities di- <br /> age or no longer efficiently serve their purposes.One vided into two categories: 1) Renovations of Existing Fa- <br /> such building is the equipment shed,which is not large cilities,and 2) New Improvements.The following initial <br /> enough to accommodate needed storage and work list should be re-evaluated on a regular basis as funding <br /> space and is beginning to show signs of wear and tear. and other processes allow,and other needs may also be <br /> From park staff perspective,indoor storage and renova- added as they are identified. <br /> tions to the maintenance building are important.Anal- <br /> ysis of renovation versus replacement of the equipment <br /> shed and other similar buildings should be undertaken. <br /> October 2021 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.