Browse
Search
OUTBoard Agenda Packet - 111721
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2021
>
OUTBoard Agenda Packet - 111721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2021 3:31:55 PM
Creation date
11/9/2021 3:31:20 PM
Metadata
Fields
Template:
BOCC
Date
11/17/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard Minutes - 111721
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MPO Board 11/10/2021 Item 23 14 <br /> NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2028 $8,690,000 PE funding approved 10/10/17 Chad Reimakoski <br /> 45910.1.1 (Buckhorn Road)to West of SR 1006 (Orange Grove Road) <br /> 45910.3.1 <br /> 1-5967 Interchange improvements at 1-85 and SR 1009 (South 10/19/2027 FY2030 $16,900,000 PE funding approved 9/8/17, Planning and Laura Sutton <br /> 45917.1.1 Churton Street) in Hillsborough Design activities underway, Coordinate <br /> 45917.2.1 with 1-0305 and U-5845 <br /> 45917.3.1 <br /> 1-5959 Pavement Rehabilitation on 1-85 from West of SR 1006 11/16/2027 FY2029 $11,156,000 PE funding approved 10/10/17, Coordinate Chad Reimakoski <br /> 45911.1.1 (Orange Grove Road)to Durham County line with 1-5967, 1-5984 and 1-0305 <br /> 45911.3.1 <br /> R-5821A Construct operational improvements including 6/20/2028 FY2031 $7,000,000 PE funding approved 10/10/17, design Rob Weisz <br /> 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, <br /> 47093.2.2 (Orange Grove Road)to SR 1107/SR 1937 (Old Fayetteville Coordinating with NC54 West Corridor <br /> 47093.3.2 Road). Study <br /> U-5845 Widen SR 1009(South Churton Street)to multi-lanes from 1- 7/18/2028 FY2031 $49,238,000 PE funding approved 5/14/15, Planning Laura Sutton <br /> 50235.1.1 40 to Eno River in Hillsborough and Design activities underway, <br /> 50235.2.1 Coordinate with 1-5967 <br /> 50235.3.1 <br /> 1-5984 Interchange improvements at 1-85 and NC 86 in 11/21/2028 FY2031 $20,900,000 PE funding approved 10/10/17, Planning Laura Sutton <br /> 47530.1.1 Hillsborough and Design activities underway, <br /> 47530.2.1 Coordinate with 1-0305 and 1-5959 <br /> 47530.3.1 <br /> 1-0305 Widening of 1-85 from west of SR1006 (Orange Grove Road) 1/1/2040 FY2044 $132,000,000 PE funding approved 6/5/18, Planning and Laura Sutton <br /> 34142.1.2 in Orange Co. to west of SR 1400 (Sparger Road) in Orange design activities underway, Project <br /> 34142.2.2 Co. reinstated per 2020-2029 STIP (funded <br /> 34142.3.2 project)and delete project 1-5983 <br /> Page 2 DCHCMPO Oct.2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.