Browse
Search
OUTBoard Agenda Packet - 111721
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2021
>
OUTBoard Agenda Packet - 111721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2021 3:31:55 PM
Creation date
11/9/2021 3:31:20 PM
Metadata
Fields
Template:
BOCC
Date
11/17/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard Minutes - 111721
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MPO Board 11/10/2021 Item 23 13 <br /> NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> P-5701 Construct Platform, Passenger Rail Station Building at 6/30/2022 FY2024 $7,200,000 PE funding scheduled 7/1/2020 Matthew Simmons <br /> 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough 10/19/2021 FY2023 <br /> 46395.3.1 <br /> 1-3306A 1-40 widening from 1-85 to Durham Co. line (US 15/501 8/17/2021 FY2024 $175,600,000 Design Build Contract Awarded - Planning Laura Sutton <br /> 34178.1.3 Interchange) in Chapel Hill and Design Activities Underway <br /> 34178.1.4 <br /> 34178.1.5 <br /> 34178.2.2 <br /> 34178.3.GV3 <br /> SS-6007V Intersection improvements (all-way stop)on SR 1567 7/14/2021 6/30/2022 $90,000 Construction underway Dawn McPherson <br /> 49706.3.1 (Pleasant Green Road)at SR 1569 (Cole Mill Road); on SR 1/3/2022 <br /> 1548 (Schley Road)at SR 1538 (New Sharon Church Road); <br /> on SR 1507 (Wilkerson Road)at SR 1545(Sawmill Road); <br /> and on SR 1114 (Buckhorn Road)at SR 1120 (Mt. Willing <br /> Road). <br /> SS-6007R Traffic signal revisions and high visibility crosswalk Mar. 2022 Jun. 2022 $12,600 Plans Complete-Construction Pending Dawn McPherson <br /> 49557.1.1 installation on SR 1010 (East Franklin Street)at Henderson <br /> 49557.3.1 Street. <br /> SS-6007AD Convert intersection from two way stop to all way stop at the Jun. 2022 Sep. 2022 $28,000 Planning and design activities underway Dawn McPherson <br /> 49823.1.1 intersection of SR 1710 (Old NC 10)and SR 1712 (University <br /> 49823.3.1 Station Road)west of Durham <br /> SS-4907CD Horizontal curve improvements on SR 1710 (Old NC 10) Jun. 2022 Nov. 2022 $261,000 Planning and design activities underway Chad Reimakoski <br /> 47936.1.1 west of SR 1561/SR 1709 (Lawrence Road)east of <br /> 47936.2.1 Hillsborough. Improvements consist of wedging pavement <br /> 47936.3.1 and grading shoulders. <br /> SS-6007E All Way Stop installation and flashing beacon revisions at the Jun. 2022 Sept. 2022 $28,800 Construction completed - Final Inspection Dawn McPherson <br /> 49115.1.1 intersection of SR 1005 (Old Greensboro Road)and SR completed on 9/23/21 <br /> 49115.3.1 1956 (Crawford Dairy Road/Orange Chapel Clover Garden <br /> Road) <br /> Page 1 DCHCMPO Oct.2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.