Browse
Search
Agenda - 12-11-2001-9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 12-11-2001
>
Agenda - 12-11-2001-9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:01:50 PM
Creation date
8/29/2008 10:36:20 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2001
Document Type
Agenda
Agenda Item
9e
Document Relationships
Minutes - 20011211
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINANCIAL IMPACT: The fnancialimpad of atloption of the oMinance bas been previously <br />tletailetl in a report to the County Manager tlated September 5, 2001 and subsequenlly <br />providetl antl tliscussed at the BOCC Wodc Sssaion of October 1, 2001. ToWI facility costs are <br />estimatetl to be approximately $315,000. Total equipment costs are estimatetl tp be <br />approximately $1,000,000, Annual opemtin9 costs, including new personnel costs, are <br />estimated b be about 5315.000. Revenues for fees, surcharges and recyclable mefedaV <br />uea are estimated to be $315,000 annually. Lost tonnage duo [o tliveralon of materials <br />from disposal to recycling is estimatetl to be approximately $305,000. Other savings relafetl to <br />elimination of annual wood waste conVac[ gdnding expenses are estimated to be about <br />$90,000. All costs are to be fundetl by the Solitl W oats enterprise funtl operating revenues or <br />reserves. When fully implementeQ the redaction/tliversion pactices contemplated in this <br />ortlinance ere antlclpatetl fo protluce a monthly reduction of between 600-750 [onalandflletl. <br />Using a general rate of thumb, [he approximate value of the landfill space thereby saved for <br />subsequent use woultl be in the range of $14,500-$16.000 par rtronth. Atltli[ionally, tlepentling <br />on actual reductions achieved in the volumes of waste being tlisposed, implementation of this <br />oMinance will also extentl [he life of a new C&D lantlfll, perhaps by as much as 3.5 years. <br />RECOMMENDATIDN(Sf~ The Manager recommends that the Board adopt the ortlinance as <br />attachetl or with modifications as directed; and appmva the creation of a permanent, full-time <br />Gonstrudion 8 Demoldion EducafionlEnfomement Specialist position, effective immetlie[ely. <br />
The URL can be used to link to this page
Your browser does not support the video tag.