Browse
Search
CFE Meeting Notes 09132021
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Commission for the Environment
>
Minutes
>
2021
>
CFE Meeting Notes 09132021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2021 3:21:46 PM
Creation date
11/9/2021 3:18:40 PM
Metadata
Fields
Template:
BOCC
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
CFE agenda 09132021
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Commission for the Environment\Agendas\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
with further evidence to support their claimed impact and resubmit. <br /> Project benefits may be easier to illustrate once routes or signage <br /> locations are identified through the planned community engagement. <br /> The CFE recommends not funding this application. While the CFE feels it <br /> is important to make highly visible sustainability investments to important <br /> community buildings such as this,there are problems with this proposed <br /> project and the application itself. <br /> Fundraising is still ongoing and therefore the funding for these <br /> sustainability upgrades might be able to come from other sources. The <br /> application is also incomplete as it contains no greenhouse gas emissions <br /> estimates. <br /> The CFE liked that these proposed upgrades would provide value over a <br /> long lifetime,but were concerned that their proposed energy efficiency <br /> impacts overlapped and cancelled each other out in many cases. For <br /> instance,the expensive Solarban window film would be applied to <br /> Sustainabilit Carrboro primarily north-facing windows, limiting its impact. If those windows <br /> y Upgrades Arts Center also had automatic roller shades that would further reduce the impact of <br /> the window film and the daylight available to supplement the proposed <br /> smart LED lighting system. <br /> Also, given that the designs for this large commercial building have not <br /> yet been finalized,this project may not be able to be implemented within <br /> two years. <br /> The CFE recommends that the applicant address these concerns and <br /> reapply. <br /> The bike rack and the bike and vehicle charging station component of the <br /> application was discussed favorably by the CFE,though some felt that <br /> these should either be added to the basic project design, or they could be <br /> added in later once the need for grant funding was clarified and the <br /> greenhouse gas impact of the proposal could be estimated. <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.