Browse
Search
Agenda - 08-16-2005-9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 08-16-2005
>
Agenda - 08-16-2005-9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:27:23 PM
Creation date
8/29/2008 10:36:19 AM
Metadata
Fields
Template:
BOCC
Date
8/16/2005
Document Type
Agenda
Agenda Item
9b
Document Relationships
2005 S Purchasing - Linked Economic Development & Affordable Housing Foundation INC- Actions Related to Planned Acquisition of Triangle SportsPlex Property
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2005
Minutes - 20050816
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Ms. Pamela K. Jones August 1, 2005 <br />RE: Senior Center Addition to Sportsplex page 2 <br />B. Architectural and Engineering design services for one-story addition of approximately 10,675 <br />SF and a renovated area of approximately 2,555 SF, <br />The Basic Services for this portion of the work include the following: <br />- Architectural design <br />- Civil Engineering design <br />- Security design <br />- Structural Engineering design <br />- HVAC/Electrical/Plumbing/Fire Protection Systems/Technology design <br />- Landscape design <br />- Cost Estimating <br />- Construction Administration (Basic Services provides one visit per week to the project <br />during the construction period (anticipated 8-month construction period). Additional site <br />visits are considered Additional Services.. <br />Basic Services consist of the following phases and are broken down by percentages for your <br />information: <br />Schematic Design Phase: 15% <br />Design Development Phase: 20% <br />Construction Document Phase: 35% <br />Biddu1g or Negotiation Phase: 5% <br />Construction Administration Phase: 25% <br />100% <br />The fee for Basic Services has been calculated to be $128,700; however, in March of this year, <br />Corley Redfoot Zack worked with Jeff Thompson of Ledahf, Inc., to draw a sketch plan for <br />this project (see attached drawing), This plan was presented to the BOCC for their <br />information, The $1,100,00 fee paid for those services is duectly re]ated to the project az1d is <br />offered as a Credit to the overall fee; therefore, we propose a fee of 127 600 for the Basic <br />Services, <br />The Structural Engineering consultant for the project will be Lasater•Hopkins{'hazig. Theh• <br />fee is X19,000 (included in Basic Services fee above), <br />The Mechanical, Electrical, az1d Phunbing Engineering consultants for the project will be <br />Reece, Noland, & McEkath, Their fee is $32,200 (included in Basic Services fee above), <br />Corley Redfoot Zack, Ina, will be prepared to execute the AIA Standard Porm of Agreement <br />Between Owner and Arclutecl as our formal agreement with the County at your request, <br />~`\"\" <br />~ r t CORLL•Y REDPOOT ZACK <br />
The URL can be used to link to this page
Your browser does not support the video tag.