Browse
Search
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2021 1:59:34 PM
Creation date
10/28/2021 8:45:44 AM
Metadata
Fields
Template:
Contract
Date
10/26/2021
Contract Starting Date
10/26/2021
Contract Ending Date
10/27/2021
Contract Document Type
Contract
Amount
$12,181.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AD41 E8C7-FC41-4249-A9C6-849589FOC156 <br /> VNK Study for Kebar Location, UCLl-, C riapel Hill, North Carolina <br /> DAA Project No.: R00592-204G <br /> November 10, 2020 <br /> Page 2 of 2 <br /> This study was conducted by registered professional geologists with extensive experience in the <br /> collection, processing, and interpretation of geophysical data. It should be noted, however, that <br /> all geophysical methods are interpretive, and additional invasive exploration would be required <br /> to verify or refute the interpretations within this report. <br /> Sincerely, <br /> DRAPER ADEN ASSOCIATES <br /> Johanna M. Vaughan, P.G <br /> Geologist <br /> Geophysical Services <br /> Christopher M. Printz, P.G <br /> Senior Project Geologist II <br /> Geophysical Services <br /> Attachment: Figures <br /> Figure 1. Site Location Map <br /> Figure 2. Photographs of Study Areas <br /> Figure 3. Marked Rebar Locations <br />
The URL can be used to link to this page
Your browser does not support the video tag.