Orange County NC Website
DocuSign Envelope ID:AD41 E8C7-FC41-4249-A9C6-849589FOC156 <br /> EXECUTION REQUIREMENTS - 017000 <br /> A. Clean Project prior to final inspection. Project clean up shall include, but not <br /> be limited to, the following: <br /> 1. Sweep paved areas. <br /> 2. Rake clean landscaped surfaces. <br /> 3. Remove waste, and surplus materials. <br /> 4. Remove temporary construction facilities. <br /> 1.5 FINAL INSPECTION AND TESTS <br /> A. Complete punch list items within 30 days of receipt from Engineer. Owner <br /> may have work not completed within 30 days performed by others with the <br /> cost deducted from the Contractor's final payment. Additional engineering <br /> and inspection services required as a result of Contractor not completing <br /> punch list within 30 days shall be at Contractor's expense. <br /> PART 2 PRODUCTS <br /> NOT USED <br /> PART 3 EXECUTION <br /> NOT USED <br /> END OF SECTION <br /> Orange County Waste and Recycling For Proposal — Not for Construction <br /> Metal and White Goods Retaining Wall Repair 01 70 00 - 4 <br /> DAA PN R00592-204ST2 November 2020 <br />