Browse
Search
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2021 1:59:34 PM
Creation date
10/28/2021 8:45:44 AM
Metadata
Fields
Template:
Contract
Date
10/26/2021
Contract Starting Date
10/26/2021
Contract Ending Date
10/27/2021
Contract Document Type
Contract
Amount
$12,181.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AD41 E8C7-FC41-4249-A9C6-849589FOC156 <br /> EXECUTION REQUIREMENTS - 017000 <br /> PART1 GENERAL <br /> 1.1 SECTION INCLUDES <br /> A. Construction Sequence. <br /> B. Close out procedures. <br /> C. Final Cleaning. <br /> D. Adjusting. <br /> 1.2 CONSTRUCTION SEQUENCE <br /> 1. Obtain submittal approval and other applicable permits. <br /> 2. Schedule preconstruction meeting with Owner, Engineer, and necessary <br /> personnel. <br /> 3. Perform wall repair per plans and specifications. <br /> 4. Schedule final inspection. <br /> 1.3 CLOSE OUT PRODEDURES <br /> A. Submit written certification that Contract Documents have been reviewed, <br /> Work has been inspected, and is complete in accordance with Contract <br /> Documents and ready for Engineer's inspection. <br /> B. Provide submittals to Engineer that are required by governing or other <br /> authorities. <br /> C. Submit set of Record Documents indicating changes during construction as <br /> required in Section, Submittal Procedures. <br /> D. Submit final Application for Payment identifying total adjusted Contract Sum, <br /> previous payments, and final amount due. <br /> E. Submit the following with final Application for Payment: <br /> 1. Affidavit of Release of Liens <br /> 2. Consent of Surety for Final Payment <br /> 3. Affidavit of Payment of Debts and Claims <br /> 4. Final Certified Payroll Information <br /> F. Submit warranties as required by individual equipment specifications. <br /> 1.4 FINAL CLEANING <br /> Orange County Waste and Recycling For Proposal — Not for Construction <br /> Metal and White Goods Retaining Wall Repair 01 70 00 - 4 <br /> DAA PN R00592-204ST2 November 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.