Browse
Search
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2021 1:59:34 PM
Creation date
10/28/2021 8:45:44 AM
Metadata
Fields
Template:
Contract
Date
10/26/2021
Contract Starting Date
10/26/2021
Contract Ending Date
10/27/2021
Contract Document Type
Contract
Amount
$12,181.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AD41 E8C7-FC41-4249-A9C6-849589FOC1 56 lent <br /> FORCED CHANGE ORDER <br /> Date: 9/29/2021 1 Jobo.: 21-13280 1 LostTime Request# 1 <br /> rojec:Metal and White Goods Wall I Gontract <br /> Owner.Orange County <br /> Reference:Costs associated with change in project scope of work <br /> Description of Work: This change order is being issued for the costs-fated with the change of project scope at Metal and White Goods Well.UMA attempted to install <br /> driven anchors to a depth of 20'and hit refusal at 7'.After multiple attempts.UMA determined that driven anchors would not be applicable for the <br /> actual conditions-untered.This change order encompasses the cost associated with the installation of hallow bar for the purpose of retaining the <br /> structure. <br /> LABOR <br /> Name NAME Craft Reg Hours Rate OT Hours Rate Amount <br /> Project Manager Organization 2 $ 95.00 0 $142.50 $ 190.00 <br /> (DEDUCT)Superintendent Install -40 $ 43.00 0 $64.50 $ (1,720.00) <br /> (DEDUCT)Laborer Install -40 $ 21.00 0 $31.50 $ 840.00 <br /> (DEDUCT)Laborer Install -40 $ 21.00 0 $31.50 $ 840.00 <br /> DEDUCT Laborer Install -40 $ 21.00 0 $31.50 $ 840.00 <br /> Superintendent Install 50 $ 43.00 0 $64.50 $ 2150.00 <br /> Laborer Install 50 $ 21.00 0 $31.50 $ 1,050.00 <br /> Laborer Install 50 $ 21.00 0 $31.50 $ 1050.00 <br /> Laborer Install 50 $ 21.00 0 i $31.50 $ 0050.00 <br /> Sub-Total Labor Cost $ 1,250.00 <br /> O&P 5% $ 62.50 <br /> Labor Burden 10% $ 125.00 <br /> Labor Total $ 1,437.50 <br /> MATERIAL AND EXPENDABLE EQUIPMENT <br /> DATE Description Unit I Quantity Rate Amount <br /> (DEDUCT)Plati us B4 Anchor EA 1 -4 $ 65.00 $ 260.00 <br /> (DEDUCT)Plati us B6 Anchor FA -4 $ 90.00 $ 360.00 <br /> (DEDUCT)#6 WF Threaded Bar 10'in length,Galvanized FA -16 S 14.00 $ 224.00 <br /> (DEDUCT)#6 WF Coupler for Galvanized Bar FA -8 $ 6.00 $ 48,00 <br /> (DEDUCT)WF Hex Nut Galvanized FA -8 S 3.75 $ 30.00 <br /> (DEDUCT)#6 WF Galvanized Washer EA -8 S 0.70 $ 5.60 <br /> (DEDUCT)Freight EA -1 $ 15000 <br /> $ 30.00 <br /> Titan 30111 Hollow Bar,3m alv. JNiht <br /> 16 $ $ 1 341.76 <br /> Titan 30111 Coupling Nut alv. 8 $ $ 175.52 <br /> Titan 30 Spherical Collar Nut hot alv. 8 $ $ 87.04 <br /> Titan 30 Wedge Disc 12 DEG alv. B $ $ 138.88 <br /> Titan 30 hardened clay bit 75 mm 8 $ $ 400.00 <br /> Portland I-11 CIF 10 $ $ 130.00 <br /> (DEDUCT)Crew Hotels(2 men per room+1 for super)total of 3 <br /> rooms er ni hl -12 $ 100.00 $ 1,200.00 <br /> Crew Hotels(2 men per room+1 for super)total of 3 rooms per <br /> night Night 15 $ 100.00 $ 1,500.00 <br /> (DEDUCT)Equipment Fuel GAL -15 $ 2.85 <br /> E ui ment.Fuel GAL 45 $ 2.85 $ 128.25 <br /> (DEDUCT)Travel Fuel GAL -25 $ 2.85 $ 71.25 <br /> Travel Fuel GAL 38 $ 2.85 $ 108.30 <br /> Deduct Per Diem 40 dollars per dayper person) EA -16 $ 40.00 $ 640.00 <br /> Per Diem 40 dollars per dayper person) FA 20 $ 40.00 $ 800.00 <br /> Material Subtotal $ 1,940.90 <br /> O&P 5% $ 97.05 <br /> Sales Taxes 7.50% $ 145,57 <br /> Shipping $ 1,200.0o <br /> Material Total $ 3,383.51 <br /> EQUIPMENT <br /> DATE Description Unit Quantity Rate Amount <br /> (DEDUCT)Bobcat Mini Excavator DAY -4 $ 168.30 $ 673.20 <br /> (DEDUCT)Chevy 3500 DAY -4 $ 62.05 $ 248.20 <br /> - (DEDUCT)Chevy 2500 DAY -4 $ 61.22 $ 244.88 <br /> (DEDUCT)Job Trailer DAY 4 $ 91.40 $ 365.60 <br /> - (DEDUCT)Generator DAY 4 $ 71.02 $ 284,08 <br /> - Grout Plant WEEK 1 $ 378.10 $ 378.10 <br /> - John Deere 333G Skid Steer WEEK 1 $ 1,190.11 $ 1,190.11 <br /> Chevy 4500 WEEK 1 1$ 771.22 $ 771.22 <br /> Chevy 3500 WEEK 1 $ 246.38 $ 246.38 <br /> Air Compressor WEEK 1 $ 867.00 $ 867.00 <br /> - Doosan Excavator Drill WEEK 1 $ 2,070.72 $ 2,070.72 <br /> Generator/Welder WEEK 1 $ 283.18 $ 283.18 <br /> - Job Trailer WEEK 1 $ 369.57 $ 369.57 <br /> Equipment Subtotal $ 4,360.32 <br /> TAX 6.00% $ 261.62 <br /> OH&P 5% $ 218.02 <br /> EQUIPMENT TOTAL $ 4 839.96 <br /> SUBCONTRACTORS <br /> DATE Description I Unit Quantity Rate 1 Amount <br /> Subcontractor Hauler FA 2 $ 1200.00 1$ 2400.00 <br /> $ <br /> $ <br /> Subcontractor Subtotal $ 2,400.00 <br /> O&P 5.00% $ 120.00 <br /> Subcontractor Total $ 2 520.00 <br /> Sent From:Brian DeSpain,UMA Dale: <br /> Approved by: TOTAL THIS CO 1$ 12 180.97 <br /> Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.