Browse
Search
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2021 1:59:34 PM
Creation date
10/28/2021 8:45:44 AM
Metadata
Fields
Template:
Contract
Date
10/26/2021
Contract Starting Date
10/26/2021
Contract Ending Date
10/27/2021
Contract Document Type
Contract
Amount
$12,181.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AD41 E8C7-FC41-4249-A9C6-849589FOC1 56 <br /> QUALITY CONTROL - 014500 <br /> 1.06 MANUFACTURER'S FIELD SERVICES AND REPORTS <br /> A. When specified in respective Specification Sections, require supplier, <br /> manufacturer, or installer, to provide qualified personnel to observe field <br /> conditions, conditions of surfaces and installation; quality of workmanship; <br /> start-up of equipment; test, adjust, and balance of equipment as <br /> applicable; and to make appropriate recommendations. <br /> B. Manufacturer's representative shall submit a written report to Engineer <br /> listing observations, site decisions, and instructions that are supplemental <br /> or contrary to manufacturer's written instructions. The manufacturer's <br /> representative shall certify that the materials and/or equipment has been <br /> properly installed and is functioning correctly. <br /> 1.07 TESTING <br /> Provide all testing specified in individual Specification Sections. All testing <br /> services shall be arranged for and paid by the Contractor unless otherwise <br /> indicated in the Contract Documents. <br /> 1.08 INSPECTION AND TESTING LABORATORY SERVICES FOR CONCRETE <br /> AND SOILS <br /> A. Where reference is made in the Specifications to tests, inspections, <br /> independent designs, etc., such services shall be furnished by the <br /> Engineer. All costs for providing such services shall be paid for by the <br /> Engineer. <br /> B. All arrangements for the testing work shall be made by the Contractor. 48 <br /> hour notice is required. Whenever inclement weather does not provide <br /> suitable testing conditions, the Contractor shall be responsible for <br /> cancellation notice to the testing agency. Any costs incurred because of <br /> failure to provide adequate cancellation notice shall be borne by the <br /> Contractor. Engineer shall be notified of arrangements made for testing <br /> work. <br /> C. If a test fails to meet specification requirements, then the area represented <br /> by that test shall be reworked and retested at the Contractor's expense. <br /> Any additional testing required to verify previously failing tests shall be at <br /> the Contractor's expense. All corrective measures shall be documented in <br /> the Quality Control reports. <br /> D. Test reports shall be supplied by the Engineer within 3 days of the <br /> completion of such testing. <br /> Orange County Waste and Recycling For Proposal — Not for Construction <br /> Metal and White Goods Retaining Wall Repair 01 45 00 - 2 <br /> DAA PN R00592-204ST2 November 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.