Browse
Search
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2021 1:59:34 PM
Creation date
10/28/2021 8:45:44 AM
Metadata
Fields
Template:
Contract
Date
10/26/2021
Contract Starting Date
10/26/2021
Contract Ending Date
10/27/2021
Contract Document Type
Contract
Amount
$12,181.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AD41 E8C7-FC41-4249-A9C6-849589FOC1 56 <br /> QUALITY CONTROL - 014500 <br /> PART GENERAL <br /> 1.01 REQUIREMENTS INCLUDED <br /> A. General quality assurance and control <br /> B. References <br /> C. Manufacturer's instructions, certificates, field services, and reports <br /> D. Testing laboratory services. <br /> 1.02 RELATED REQUIREMENTS <br /> A. Section 013300 Submittal Procedures <br /> 1.03 GENERAL QUALITY CONTROL <br /> A. Maintain quality control over suppliers, manufacturers, products, services, <br /> site conditions, and workmanship, to produce work of specified quality. <br /> B. Comply with industry standards except when more restrictive tolerances or <br /> specified requirements indicate more rigid standards or more precise <br /> workmanship. <br /> C. Perform work by persons qualified to produce workmanship of specified <br /> quality. <br /> D. Secure products in place with positive anchorage devices and sized to <br /> withstand stresses, vibration, physical distortion, and disfigurement. <br /> 1.04 REFERENCES <br /> A. Conform to the referenced standards and Standard Specifications. <br /> B. Specific provisions of codes, regulations and standards may be <br /> referenced in individual Specifications to assist the Contractor and identify <br /> options selected by the Engineer. Such references do not relieve the <br /> Contractor from compliance with other applicable provisions of codes, <br /> regulations, and standards not specifically referenced. <br /> C. Should specified reference standards conflict with Contract Documents, <br /> request clarification from Engineer before proceeding. <br /> 1.05 MANUFACTURER'S INSTRUCTIONS AND CERTIFICATES <br /> A. Comply with manufacturer's instructions in full detail, including each step <br /> in sequence. Should instructions conflict with Contract Documents, <br /> request clarification from Engineer before proceeding. <br /> B. When required by individual Specifications Section, submit manufacturer's <br /> certificate that products meet or exceed specified requirements. <br /> Orange County Waste and Recycling For Proposal — Not for Construction <br /> Metal and White Goods Retaining Wall Repair 01 45 00 - 1 <br /> DAA PN R00592-204ST2 November 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.