Browse
Search
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2021 1:59:34 PM
Creation date
10/28/2021 8:45:44 AM
Metadata
Fields
Template:
Contract
Date
10/26/2021
Contract Starting Date
10/26/2021
Contract Ending Date
10/27/2021
Contract Document Type
Contract
Amount
$12,181.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AD41 E8C7-FC41-4249-A9C6-849589FOC156 <br /> SUBMITTAL PROCEDURES - 013300 <br /> requirements of Contract Documents, and has coordinated submittal with <br /> related work. <br /> F. Schedule submittals to expedite Project, and deliver to coordinate <br /> submission of related items. Allow a minimum of fifteen (15) working days <br /> for Engineer's review. <br /> G. Identify variations from Contract Documents and Product limitations as <br /> they relate to the satisfactory performance of the Project. <br /> H. Provide space for Contractor and Engineer review stamps. <br /> I. Revise and resubmit submittals as required — identify changes made since <br /> previous submittal. <br /> J. Distribute copies of reviewed submittals to concerned parties. Instruct <br /> parties to promptly report inability to comply with provisions. <br /> K. Work requiring submittal review by Engineer shall not be started until <br /> review has been obtained. <br /> L. Engineer's review of submittals shall not relieve Contractor of <br /> responsibility for complete compliance with Contract Documents. <br /> 1.3 ADMINISTRATIVE SUBMITTALS <br /> A. Construction Progress Schedule <br /> 1. Submit five (5) copies of the initial progress schedule 15 days after <br /> date of Agreement. One copy shall be returned to the Contractor. <br /> 2. Progress schedule shall be, as a minimum, a horizontal bar chart <br /> with a separate line for each major section of Work. Identify the first <br /> workday of each week. <br /> 3. Show complete sequence of construction by activity, identifying <br /> Work of separate stages and other logically grouped activities. <br /> Indicate the early and late start, early and late finish, float dates, <br /> and duration. <br /> 4. Indicate the expected monthly par requests. <br /> 5. Submit revised schedule with each Application for Payment as <br /> required for updating, identifying changes since previous <br /> version. Indicate estimated percentage of completion for each <br /> item of Work at each submission. <br /> Orange County Waste and Recycling For Proposal — Not for Construction <br /> Metal and White Goods Retaining Wall Repair 01 33 00 - 2 <br /> DAA PN R00592-204ST2 November 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.