Browse
Search
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2021 1:59:34 PM
Creation date
10/28/2021 8:45:44 AM
Metadata
Fields
Template:
Contract
Date
10/26/2021
Contract Starting Date
10/26/2021
Contract Ending Date
10/27/2021
Contract Document Type
Contract
Amount
$12,181.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AD41 E8C7-FC41-4249-A9C6-849589FOC156 <br /> SUBMITTAL PROCEDURES - 013300 <br /> PART 1 - GENERAL <br /> 1.1 SECTION INCLUDES <br /> A. This Section includes, but is not limited to, requirements for the following: <br /> 1. Submittal procedures <br /> 2. Construction progress schedule <br /> 3. Schedule of values <br /> 4. Project record documents <br /> 5. Certificates of compliance <br /> 6. Catalog data <br /> 7. Shop drawings <br /> 8. Manufacturer's installation procedures <br /> 9. Samples <br /> 10. Warranties <br /> 11. Spare parts and maintenance materials <br /> 1.2 SUBMITTAL PROCEDURES <br /> A. Transmit each submittal with cover letter to the Engineer: Tyrus Clayton, Jr. P.E. <br /> Draper Aden Associates — 114 Edinburgh South Drive, Suite 200 Cary, North <br /> Carolina, 27511 <br /> B Sequentially number transmittal forms. Re-submittals are to have original <br /> number with an alphabetic suffix. <br /> C. Cover letter for each submittal package shall list the following: <br /> 1. Contractor's Name: <br /> 2. Project Name: Metal and White Goods Retaining Wall Repair <br /> 4. Draper Aden Associates PN R00592-204ST <br /> D. Individual submittals shall each be listed by the following information: <br /> 1. Submittal reference number <br /> 2. Specification section number <br /> 3. Drawing and detail number when appropriate <br /> 4. Equipment <br /> 5. Type submittal <br /> 6. Supplier <br /> 7. Manufacturer <br /> E. Apply Contractor's stamp to each submittal signed or initialed and dated, <br /> certifying that Contractor has reviewed submittal for conformance with <br /> Orange County Waste and Recycling For Proposal — Not for Construction <br /> Metal and White Goods Retaining Wall Repair 01 33 00 - 1 <br /> DAA PN R00592-204ST2 November 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.