Browse
Search
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-633-E-Solid Waste-UMA Geotechnical Construction-Change Order Retaining Wall Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2021 1:59:34 PM
Creation date
10/28/2021 8:45:44 AM
Metadata
Fields
Template:
Contract
Date
10/26/2021
Contract Starting Date
10/26/2021
Contract Ending Date
10/27/2021
Contract Document Type
Contract
Amount
$12,181.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AD41 E8C7-FC41-4249-A9C6-849589FOC156 <br /> Draper Aden Associates <br /> Eniziueerhrg • Sm'rcrarrg L}nirarruelrlrrl Seri^roes <br /> 114 Edinburgh South Drive <br /> Suite 200 <br /> Cary,North Carolina 27511 <br /> 919.827.0864 <br /> www.daa.com <br /> February 1, 2021 <br /> RE: REQUEST FOR PROPOSALS <br /> Orange County solid Waste Management—Metal and White Goods Retaining Wall Repair <br /> Draper Aden Associates Project No. R00592-204ST2 <br /> Draper Aden Associates is soliciting proposals for the repair of two retaining walls. Work shall include all necessary <br /> excavation, shoring, backfill, and associated site work as shown in the construction drawings and detailed in the <br /> project specifications package, as well as in accordance with Orange County standards, and the NEC. <br /> Proposals will be received by Draper Aden Associates at 114 Edinburgh South Drive, Suite 200, Cary, North Carolina, <br /> 27S11 until 2:00 PM (Local Time), Thursday, February 18th, 2021. Proposals must be emailed to saandy@daa.com <br /> and rowilliams@orangecountync.gov. Please confirm receipt of email. <br /> The Contract Documents may be obtained from the following locations: <br /> Draper Aden Associates Planroom: www.DAA.com Then Click"PLANROOM" <br /> Please feel free to use the service of your choice for hard copies of plans and specifications. <br /> Work is to be substantially completed within 30 calendar days after the date when the contract times commence <br /> and ready for final payment within 60 calendar days. <br /> Should you have any questions, please do not hesitate to contact me at 919-827-0909. <br /> Sincerely, <br /> Draper Aden Associates <br /> Steven R. Gandy, P.E. <br /> Chief Engineer <br /> Attachment: Orange County Waste and Recycling—Wastewater Disposal System Project Manual <br /> Orange County Waste and Recycling —Wastewater Disposal System Plans <br /> Cc: Bruce Woody <br /> Cheryl Young <br /> Andrew Martin <br /> File <br /> 131aeksbuig •('harlollesville •A/mrassas •Nciiporl News • Richmond• Higiuia Beach <br /> P'gvelieville •Raleigh <br />
The URL can be used to link to this page
Your browser does not support the video tag.