Orange County NC Website
include System extensions must include approved preliminary plans far <br />the System extension. <br />C. All System extensions must be consistent with Goal 9.3 of <br />the Orange County Land Use Plan which goal "pmhibif[s] the <br />establishment of public water and sewer services in the areas designated <br />water quality critical areas, except to atldress emeryency situations • ~ <br />w't ado tetl as all of its <br />Combrehens've Plan. <br />0. All System extensions shall be Installed acwNing to antl in <br />compliance with approvetl plans. <br />E. Constmction of Sysfem extensions will be inspectad by <br />Orange County ar;tae;,eiaear at intervals tleterminetl by the County. The <br />person seeking System extension agrees to pertnrt access to the System <br />and the System extension for inspection puryoses. User connections to <br />tM1e System will only be permitted after the extension of the System is <br />fnelly epprovetl in writing by Orange County. <br />F. Upon the cempletion of iha Gyalem extension [he <br />owner/developer will convey by deetl or other appropriate insfmment all <br />portions of the System extension, including but not necessarily limitetl [o <br />right-of-way easements, collection lines, service lines, stub-outs, permits, <br />pump stations end equipment, plumbing fadbtles antl M1ardware. NI <br />System extensions will be at no cost to Orange County. <br />ameneee <br />i rm <br />c Excemt a m~ dad 'n se~dn vl c nr m I II <br />sy t xte ~ t f ul m <br />