Orange County NC Website
DRAFT -HABITAT CONTRACT <br />12130/2001 <br />2. The Developer shall secure approval of the mnstructlon plans by the following <br />agencies or authorities. <br />County Engineer <br />North Carolina Department of Environment antl Natual Resources <br />North Camlina Department of Tansportation <br />3. The Developer shall obtain any newssary encroachment agreements or <br />manta far use of property not awnatl by the untleaignetl Developer or <br />Project owner <br />G Construction ReouiremenLs <br />1. Unless otherwise provided In this contact or motlrfletl by the accepted/approvetl <br />technleal specifications far this Project all wnstmdion, materials, equipment, <br />practices, etc., shall wnform tc County policy, stantlartls, technical <br />spec~cationa (ae outlinetl in Appentlix B) antl the EFlantl Sewer System Rules <br />of Opea[ion. <br />a) The County shall designate the s¢a antl type of material for ell sewer lines. <br />b) All work shall be sublect to inspection by the County antl the Engineer of <br />Recortl on the mns[mction documents. Nc line may be coveretl up until <br />such inspection has taken place and if any line or facility is covered up poor <br />to inspection, [he County may require such line or facil'Ty to be uncaveretl or <br />expoaetl to view at the Developers expense to fadlita[e such inspection. <br />c) The contractors surveyor shall pmvitle cens[mction stakeout antl the <br />Engineer of Recortl shall monhor antl verRy the cpnstrudion stakeout by fieltl <br />exeminatlon. <br />tl) The County will require any testingmtletermine that the work mmpliea with <br />County stantlaNS antl apecigca[ions. All such testing shall be at the <br />Developers expense <br />e) All mnstmdion shall be performetl by a Contractor licensed antl bontled to <br />perform thls type of work in North Carolina. <br />i) Engineer of Remrtl will pmvitle 23 unannounced spot checks of sewerline <br />installaGOn me[hotle, epecifca[bns antl progress each week that work Is <br />being performetl. Developers constmdion sfeH, following training by the <br />Engineer of Rewrd, will provide daily on site inspec[bns tluring [he time <br />work is parformetl antl shall prepare tlaily logs to be approvetl by the <br />Engineer of RewN. The Engineer of RecoN will inspectand sign off on <br />bedding of present sewer lines during Installation cf lateals. Developers <br />