Browse
Search
2021-598-E-AMS-Pine Shore Energy-To install L2 Pedestal Mounted EVSE at the ERPD
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-598-E-AMS-Pine Shore Energy-To install L2 Pedestal Mounted EVSE at the ERPD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2021 3:37:30 PM
Creation date
10/22/2021 3:37:21 PM
Metadata
Fields
Template:
Contract
Date
10/20/2021
Contract Starting Date
10/20/2021
Contract Ending Date
10/21/2021
Contract Document Type
Agreement
Amount
$14,041.31
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Provide and/or prepare mounting surface for <br />new electrical service equipment in accordance <br />with MFG recomendations and NEC. <br />2. Provide meterbase to accomodate 400A <br />120/240V meter and outdoor panel. Provide <br />conduit from meter base to 400A 240/120vAC <br />Single Phase panelboard. Coordinate all <br />requirements with Duke Energy. <br />3. Borehole thru concrete deck as required for <br />running conduit from meter to panelboard. <br />4. Provide Paneloard EV1N located adjacent to <br />EV Charging Cluster on parking deck Levels 1 <br />to 2. Provide ten (10) 40A-2P and four (4) <br />20A-1P circuit breakers, <br />5. Borehole thru concrete deck as required for <br />running conduit from panelboard to existing <br />EVSE #1 thru #4 and future EVSE #4 thru #10 <br />6. Existing conduit and feeder circuits enter <br />EVSE #1 thru #4 thru concrete deck to bottom <br />of units from existing panelboard in West <br />Campus Office Building. Disconnect, abandon <br />in place and tag existing conduit and wiring <br />from Panelboard to JB near EVSE. <br />7. Provide new conduit and conductors as <br />required from new panel board EV1N to <br />existing EVSE #1 thru #4. Pathways shall be <br />sized to accomodate 6 future EVSE. <br />8. Connect existing 120vAC EVSE control <br />circuit to new control circuit in new panelboard. <br />9. Terminate and test all wiring for power and <br />controls. <br />Scope of Work <br />Area of Work <br />(EVSE on Levels One to Two) <br />Sheet Title: <br />Date <br />Designed by: <br />Checked by: <br />Pine Shore Energy LLC <br />131 Fayette St NW <br />Winston-Salem, NC 27101 <br />©2021 <br />828-553-6257 <br />Dave@pineshoreenergy.com <br />www.pineshoreenergy.com <br />THIS DRAWING IS NOT TO BE SCALED <br />FOR CONSTRUCTION PURPOSES. THE <br />SCALE WHEN INDICATED IS FOR <br />GENERAL REFERENCE ONLY. <br />Project #: <br />STATEWIDE TERM <br />CONTRACT 691A <br />ELECTRIC VEHICLE <br />CHARGING STATION <br />EQUIPMENT, <br />ACCESSORIES, <br />INSTALLATION & <br />INFRASTRUCTURE <br />Planning <br />Phase: <br />C:\Users\dave\Documents\Pineshore\Projects\4. projects_con\Orange_County_NC\OC_Parking_Deck\dwg\OC_Gateway_Center_Parking_Deck_EVSE_Upgrades.rvt 9/24/2021 12:12:56 PM <br />E0 <br />E-092421Orange County, SustainabiltyEV Charging ElectricalUpgradesDT <br />Planning - Site & <br />Scope of WorkNash & Kollock StreetHillsboro, NC 27278Sept 24, 2021 <br />Estimate <br />1" = 100'-0"2 Site Work Area <br />NOT TO SCALE1Site Location <br />DocuSign Envelope ID: BC65C531-1F9F-4A99-B7A9-5A90267E0C11
The URL can be used to link to this page
Your browser does not support the video tag.