Browse
Search
2021-586-E-AMS-Wayne Roofing & Sheet Metal Company-Motor Pool Facility Replace Existing Roof System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-586-E-AMS-Wayne Roofing & Sheet Metal Company-Motor Pool Facility Replace Existing Roof System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 2:35:49 PM
Creation date
10/18/2021 2:33:45 PM
Metadata
Fields
Template:
Contract
Date
10/14/2021
Contract Starting Date
10/14/2021
Contract Ending Date
10/18/2021
Contract Document Type
Contract
Amount
$209,407.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />013300.2 –SUBMITTALS <br /> <br />Project Manual for Motor Pool Main Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />August 2021 <br />3. Product SDS for each material to be installed and associated equipment/products to be used <br />during installation. <br />4. Material samples of shingles, vented nailbase, metal wall panels, etc. to be used as requested by <br />the Engineer. Material samples must have manufacturer’s product identification on the sample. <br />5. Color selection materials for pre-finished metal, sealants, shingles, or other products as noted in <br />the applicable specification sections. Physical metal chip samples in addition to a color chart <br />will be requested for pre-finished metal color selection. <br /> <br />B. The following technical submittals shall be provided: <br />1. Detailed outline of the methods and means to be followed during the installation of the roof <br />system. Once accepted, this outline may only be changed with written approval. Include <br />procedures to keep roof areas dry through each stage of the construction process. Emergency <br />contact numbers will be provided with plans for checking the building interior during rain <br />events and maximum response times listed. <br />2. Shop drawings for details or constructions for the purpose of providing additional information, <br />such as detail configurations and metal fabrication shapes and sizes, etc. Show securement <br />patterns for the vented nailbase as well as perimeter and corner dimensions to meet code- <br />required and specified wind uplift loads. If any details provided on the shop drawings vary <br />from those shown on the project documents, the Contractor must note such variance on the <br />submittal to indicate that a change is requested. The Engineer will review such requested <br />revisions and will approve or reject at their sole discretion. <br />3. Certifications that materials to be installed are asbestos-free and are compatible with the <br />substrates to which they will be applied. <br />4. Letter from the roof system manufacturer stating that the Contractor (or subcontractor when <br />applicable) is an approved applicator of its roof system as specified. <br />5. Letter from the roof system manufacturer indicating review of the project documents, <br />acceptance of design intent and details as shown, and intent to issue the specified warranty, <br />including acknowledgment of any warranty modifications specified. Refer to Section 014000 <br />for additional information. Letter must be project specific and shall include the type and <br />duration of warranty, riders, any manufacturer’s additional requirements, and a sample copy of <br />actual warranty; including materials and weathertightness as applicable. <br />6. A sample copy of the Contractor’s Five-Year Warranty. <br />7. Pre-Job Damage Survey in accordance with Section 024110 of this Project Manual. <br />8. Additional submittals as requested in each section. <br /> <br />C. The following administrative submittals shall be provided: <br />1. Building permits as required by the federal, state or any local entity for the construction or <br />demolition work required during the progress of the Work. If no permits are required, so state. <br />2. Proposed preliminary progress schedule for the Work. Revise and submit progress schedule as <br />necessary. Review Owner requirements for progress schedules. Progress schedules should <br />include line items for specific work activities at each roof area or group of areas with both <br />schedule dates for the line item and a graphical representation of those dates along with a line to <br />compare actual schedule progress. <br />3. Schedule of Values for the project. Work Items shall be generally divided by Project Manual <br />Section and into materials and labor cost. Copies of invoices/quotes from supplier for materials <br />may be requested to ensure that material costs listed are not significantly increased in <br />comparison to labor costs. <br />DocuSign Envelope ID: 9514E4EC-C3C9-4752-8A7F-22E83B22BB8E
The URL can be used to link to this page
Your browser does not support the video tag.