<br />013300.1 –SUBMITTALS <br /> <br />Project Manual for Motor Pool Main Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />August 2021 <br />SECTION 013300 <br /> <br />SUBMITTALS <br /> <br />PART 1 GENERAL <br /> <br />1.01 PROCEDURES <br /> <br />A. Make submittals required by the Contract Documents in a timely manner to allow for sufficient <br />review and approval by the Engineer. Revise and resubmit as necessary to establish compliance with <br />the specified requirements. Submit documents to Engineer electronically with Submittal Form SF-1 <br />attached to document and consecutively numbered. An electronic version of SF-1 will be made <br />available upon request. <br /> <br />1.02 WORK INCLUDED <br /> <br />A. Electronic copies of submittals are preferred. Each submittal must be accompanied with a transmittal <br />form as provided at the end of this section. For items that cannot be submitted electronically (large <br />format shop drawings, physical samples, color charts or chips, shingle samples, etc.), deliver to the <br />Engineer for review. Physical submittals must still be accompanied by a transmittal sheet. <br /> <br />B. The Work may not proceed until the complete pre-job submittal package, including shop drawings, <br />has been reviewed and approved by the Engineer. Update submittals to the Engineer during <br />construction to account for new equipment, products, etc. used on the project. Engineer may elect to <br />allow phased submittals to meet work schedule if agreed upon in advance with the Contractor. <br /> <br />C. At the end of the project, submit a minimum of four complete sets of "Post-Job Submittals" to the <br />Engineer for review, following the final acceptance of the Work. These submittals must be provided <br />as hardcopies due to the types of documents involved. Requests for final payment will not be <br />approved until the Post-Job Submittal package has been accepted by the Owner. Organize post-job <br />submittals keyed to a list of items required under Article 1.04 of this Section. <br /> <br />D. Identify individual submittals by product type or name on the submittal form and include a table of <br />contents in each submittal package or transmittal email listing items included. <br /> <br />E. Submittals listed in this Section and required by other Sections to be submitted in accordance with <br />this Section are applicable. If in the opinion of the Contractor, an item listed is not applicable, the <br />Contractor must submit documentation substantiating his position. Likewise, if a submittal is <br />unavailable, the Contractor must submit documentation reconstructing the missing information as <br />best as can be accomplished. <br /> <br />1.03 CONTRACTOR'S PRE-JOB SUBMITTALS <br /> <br />A. The following material and product submittals shall be provided: <br />1. Product data for each material and product to be installed to confirm conformance with <br />specified requirements or to provide information on additional products required for <br />installation. <br />2. Product manufacturers’ installation instructions for each material and product to be installed. <br />DocuSign Envelope ID: 9514E4EC-C3C9-4752-8A7F-22E83B22BB8E