Orange County NC Website
<br /> <br />012100.2 – BASE BID ALLOWANCES (ESTIMATED QUANTITIES) <br /> <br />Project Manual for Motor Pool Main Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />August 2021 <br />PART 2 PRODUCTS - Not Used. <br /> <br />PART 3 EXECUTION - Not Used. <br /> <br />3.01 PREPARATION AND INSTALLATION <br /> <br />A. Prepare, supply, and install products associated with estimated quantity work in accordance with the <br />technical specification sections in which they are specified. <br /> <br />3.02 DOCUMENTATION OF ESTIMATED QUANTITY WORK <br /> <br />A. A representative of the Owner and/or Designer should be made aware when work items performed <br />as a part of the estimated quantity work are anticipated, unless otherwise agreed upon during the pre- <br />construction meeting. <br /> <br />B. Documenting and tracking of actual estimated quantity work performed is the responsibility of the <br />Contractor is important to allow for comparison with estimated quantities during work progress and a <br />proper reconciliation of contract work at project acceptance. The Designer/Owner may deny <br />payment for work performed by the Contractor if adequate documentation of work performed cannot <br />be provided. At minimum, photographic documentation of the existing condition requiring estimated <br />quantity work, removal of existing materials, and installation of replacement materials will be <br />required if direct observation by the Engineer or Owner is not possible. <br /> <br />END OF SECTION 012100 <br />DocuSign Envelope ID: 9514E4EC-C3C9-4752-8A7F-22E83B22BB8E