Browse
Search
2021-586-E-AMS-Wayne Roofing & Sheet Metal Company-Motor Pool Facility Replace Existing Roof System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-586-E-AMS-Wayne Roofing & Sheet Metal Company-Motor Pool Facility Replace Existing Roof System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 2:35:49 PM
Creation date
10/18/2021 2:33:45 PM
Metadata
Fields
Template:
Contract
Date
10/14/2021
Contract Starting Date
10/14/2021
Contract Ending Date
10/18/2021
Contract Document Type
Contract
Amount
$209,407.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
010100.6 –SUMMARY OF WORK <br /> <br />Project Manual for Motor Pool Main Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />August 2021 <br />1.08 DESIGNER’S SITE VISITS <br /> <br />A. Designer or site representative will perform periodic visits to the site to observe Contractor <br />activities and note non-conformance with the specifications to the Owner and Contractor. Non- <br />conformance items must be corrected by the Contractor prior to approval of payment. <br /> <br />B. Contractor shall cooperate with the representatives and personnel of the Designer to provide safe <br />means and facilities for the Designer to observe all parts of the work for the purpose of <br />determining conformance/non-conformance with the specifications. <br /> <br />C. Contractor must notify the Designer a minimum of 48 hours prior to specific activities for which <br />the Designer wishes to be present. The applicable activities will be defined by the Designer <br />during the Pre-Construction Meeting, but are anticipated to include first day of removal and <br />replacement on main roof areas or installation of specific details. If Contractor fails to notify the <br />Designer to allow for observation, Designer may request to observe work, including covered <br />work, to confirm conformance with the contract documents at no additional cost to the Owner. <br /> <br /> <br />PART 2 PRODUCTS – NOT USED <br /> <br />PART 3 EXECUTION – NOT USED <br /> <br />END OF SECTION 010100 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 9514E4EC-C3C9-4752-8A7F-22E83B22BB8E
The URL can be used to link to this page
Your browser does not support the video tag.