Orange County NC Website
 Bidders should fully examine the Project Documents and existing site conditions prior to submitting their <br />bid. If there are any questions regarding the design intent, or any errors or discrepancies in the drawings <br />or documents are found, bidders should immediately notify the Designer to allow for correction or <br />clarification in an addendum to all bidders. Addendum No. 1 will include the pre-bid meeting minutes <br />and to respond to any unanswered questions. Addenda will be sent to each plan holder including eligible <br />bidders, manufacturers, or subcontractors. The person attending the pre-bid meeting will receive such <br />addenda unless a different contact person from that company has been requested. <br /> <br /> A walk through was conducted. <br />DocuSign Envelope ID: 9514E4EC-C3C9-4752-8A7F-22E83B22BB8E