Browse
Search
2021-586-E-AMS-Wayne Roofing & Sheet Metal Company-Motor Pool Facility Replace Existing Roof System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-586-E-AMS-Wayne Roofing & Sheet Metal Company-Motor Pool Facility Replace Existing Roof System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 2:35:49 PM
Creation date
10/18/2021 2:33:45 PM
Metadata
Fields
Template:
Contract
Date
10/14/2021
Contract Starting Date
10/14/2021
Contract Ending Date
10/18/2021
Contract Document Type
Contract
Amount
$209,407.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />230800.3- GENERAL MECHANICAL AND ELECTRICAL REQUIREMENTS <br /> <br />Project Manual for Motor Pool Main Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />August 2021 <br />units/components to determine which items may require modification, disconnection, raising or <br />removal of the cover or other components to accommodate flashing installation, prior to the bid. <br />Necessary costs for disconnection and reconnection of existing mechanical and electrical systems as <br />required for proper installation of the new roof systems shall be included in the base bid. <br /> <br />C. Once services have been reconnected, test equipment and components to ensure that they are in <br />working condition and meet or exceed the condition as documented in the pre-job condition survey. <br />Obtain Owner approval/agreement that components are in acceptable working order. <br /> <br />D. If physical damage to units and/or systems is observed, or units and/or systems are not in working <br />condition and the damages were not previously listed on the pre-job condition survey, the equipment <br />or service shall be repaired by the Contractor at no cost to the Owner. If testing indicates that units <br />are not performing as documented in the pre-job condition survey, provide necessary services, at no <br />cost to the Owner, to assure the proper operation of the unit and/or system. <br /> <br /> <br />END OF SECTION 230800 <br />DocuSign Envelope ID: 9514E4EC-C3C9-4752-8A7F-22E83B22BB8E
The URL can be used to link to this page
Your browser does not support the video tag.