Orange County NC Website
<br />230800.2- GENERAL MECHANICAL AND ELECTRICAL REQUIREMENTS <br /> <br />Project Manual for Motor Pool Main Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />August 2021 <br /> <br />A. Submit records of any damages as a part of the Pre-Job Damage Survey (required by Section <br />024110) that includes documentation of existing component locations and documentation of the <br />condition of units/services including interior components and exterior housing of equipment/systems <br />prior to performing any disconnection or modifications to them. <br /> <br />B. Upon completion of work reconfirm equipment remains in working condition. If modifications were <br />required, provide copies of all applicable inspections and certification from the licensed Contractor <br />or Sub-contractor confirming that the work is in conformance with the applicable standards. <br /> <br />1.04 WARRANTY <br /> <br />A. If replacement of an existing mechanical or electrical component(s) is necessary, due to damage <br />during construction activities, replacement will be performed at no cost to the Owner and the <br />equipment or component manufacturer’s standard product warranty shall be provided in addition to <br />the Contractor’s five year warranty against defects of materials and workmanship. <br /> <br /> <br />PART 2 PRODUCTS <br /> <br />2.01 MATERIALS <br /> <br />A Provide materials and accessories (such as ductwork, wood blocking, electrical wiring, control <br />wiring, etc.) required for a complete and proper installation of the work as specified herein and on the <br />project drawings in accordance with applicable local, state, and federal codes and regulations. <br /> <br />B. Materials and equipment shall bear certification of UL, ASME where such labels are customary, <br />required, or specified. <br /> <br />PART 3 EXECUTION <br /> <br />3.01 DOCUMENTATION OF EXISTING CONDITIONS <br /> <br />A. Document locations of units, fixtures, piping/conduit and other services. <br /> <br />B. Inspect and test each unit, service, fixture, and component that may require modification, <br />disconnection and/or relocation to confirm working order. Coordinate with the Owner to allow for <br />them to be present during inspection. <br /> <br />3.02 DISCONNECTION/RECONNECTION OF MECHANICAL AND ELECTRICAL SERVICES <br /> <br />A. Disconnect mechanical piping, electrical/control wiring, conduit, or other components to allow for <br />safe temporary movement from their existing locations as necessary to accommodate proper <br />installation of the new roof system, flashing of utility penetrations, and associated components <br />shown on the drawings. <br /> <br />B. Work shall be performed in accordance with specified codes and regulations. It is the responsibility <br />of the contractor to make all necessary investigations of the existing electrical and mechanical <br />DocuSign Envelope ID: 9514E4EC-C3C9-4752-8A7F-22E83B22BB8E