Browse
Search
2021-586-E-AMS-Wayne Roofing & Sheet Metal Company-Motor Pool Facility Replace Existing Roof System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-586-E-AMS-Wayne Roofing & Sheet Metal Company-Motor Pool Facility Replace Existing Roof System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 2:35:49 PM
Creation date
10/18/2021 2:33:45 PM
Metadata
Fields
Template:
Contract
Date
10/14/2021
Contract Starting Date
10/14/2021
Contract Ending Date
10/18/2021
Contract Document Type
Contract
Amount
$209,407.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />073113.3 – ASPHALT SHINGLED ROOF SYSTEM <br /> <br />Project Manual for Motor Pool Main Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />August 2021 <br /> <br />C. Store flammable products away from sparks or open flames. <br /> <br />D. Store roofing materials at a minimum of forty-five (45) degrees Fahrenheit prior to use as <br />recommended by the roof membrane system manufacturer. Protect material from freezing. <br /> <br />1.05 ENVIRONMENTAL REQUIREMENTS <br /> <br />A. Proceed with roofing work only when weather conditions comply with roof system <br />manufacturer’s recommendations. Do not violate temperature limitations recommended by the <br />manufacturer. <br /> <br />B. Take special care if applying self-adhering waterproof underlayment when ambient or wind chill <br />temperature is below 45° F (7 °C). Fasten/tack the underlayment in place if immediate adhesion <br />to the deck does not occur. <br /> <br />1.06 WARRANTIES <br /> <br />A. Provide a Contractor’s 5-year Warranty for all work included in the project. This warranty shall <br />include workmanship, materials of the roofing systems against leakage and against defects due to <br />faulty materials, workmanship and contract negligence following acceptance of the project by the <br />Owner, and will be provided in addition to the roof system manufacturer’s warranties. The <br />warranty will extend for a period of sixty (60) months from the date of Final Completion unless <br />otherwise agreed upon by the Owner and Designer. <br /> <br />B. Provide Roof System Manufacturer’s 40-year limited system warranty covering labor and <br />materials for replacement or repair for manufacturing defects in the shingles. The warranty shall <br />also include a clause for a 10-year algae resistance warranty or a separate algae resistance <br />warranty may be provided. The warranty shall also include a clause for a 10-year wind warranty <br />for the rated wind speed (110 mph). The warranty will begin from the date of Final Completion <br />unless otherwise agreed upon by the Owner and Designer. <br /> <br />C. Provide an extended roof system manufacturer’s warranty covering material and labor costs for <br />repairs or replacement, disposal costs, and workmanship defects for a minimum period of 5 years <br />from the date of Final Completion unless otherwise agreed upon by the Owner and Designer. <br />This warranty shall be provided in addition to the roof system manufacturer’s limited warranty <br />and shall not be subrogated to the installing contractor. <br /> <br />D. Provide other standard available manufacturer’s material warranties as applicable. <br /> <br />1.07 EXTRA MATERIALS <br /> <br />A. Provide adequate shingle “attic” stock to the Owner to allow for isolated repairs totaling 200 <br />square feet of the type specified. Provide a representative color variation to best match the <br />variation in the shingle color utilized on the project. <br /> <br /> <br /> <br />DocuSign Envelope ID: 9514E4EC-C3C9-4752-8A7F-22E83B22BB8E
The URL can be used to link to this page
Your browser does not support the video tag.