Browse
Search
2021-586-E-AMS-Wayne Roofing & Sheet Metal Company-Motor Pool Facility Replace Existing Roof System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-586-E-AMS-Wayne Roofing & Sheet Metal Company-Motor Pool Facility Replace Existing Roof System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 2:35:49 PM
Creation date
10/18/2021 2:33:45 PM
Metadata
Fields
Template:
Contract
Date
10/14/2021
Contract Starting Date
10/14/2021
Contract Ending Date
10/18/2021
Contract Document Type
Contract
Amount
$209,407.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />024110.5 – SELECTIVE DEMOLITION <br /> <br />Project Manual for Motor Pool Main Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />August 2021 <br />required. To ensure that accurate quantities of work performed are included in this comparison, <br />the Contractor must provide specific documentation of work type, quantities, and confirmation <br />that work was warranted. Documentation can include review of existing conditions or work <br />performed (prior to covering) by the Contractor and Engineer (or Owner’s representative) with <br />agreed upon quantities photographed and documented in the Engineer’s site visit report. If the <br />Engineer is not available, the Contractor is responsible for photographing the <br />damaged/deteriorated materials/conditions and photographing the repaired/replaced materials <br />(with scale to allow for confirmation of measurements) of the material and submitting these to the <br />Engineer at the next site visit or progress meeting. If approved by the Engineer, it may be <br />acceptable to stockpile removed deterioration component/material (when applicable) until <br />confirmation by the Engineer can be made. Payment for work performed (or consideration of <br />work performed toward the estimated quantities) may not be provided without proper <br />documentation. <br /> <br />O. Raise all penetrations as needed to finish a minimum of 8" above the finished roof surface. <br /> <br />P. Do not burn or bury materials on site. <br /> <br /> <br />END OF SECTION 024110 <br />DocuSign Envelope ID: 9514E4EC-C3C9-4752-8A7F-22E83B22BB8E
The URL can be used to link to this page
Your browser does not support the video tag.