Browse
Search
2021-586-E-AMS-Wayne Roofing & Sheet Metal Company-Motor Pool Facility Replace Existing Roof System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-586-E-AMS-Wayne Roofing & Sheet Metal Company-Motor Pool Facility Replace Existing Roof System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 2:35:49 PM
Creation date
10/18/2021 2:33:45 PM
Metadata
Fields
Template:
Contract
Date
10/14/2021
Contract Starting Date
10/14/2021
Contract Ending Date
10/18/2021
Contract Document Type
Contract
Amount
$209,407.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />024110.4 – SELECTIVE DEMOLITION <br /> <br />Project Manual for Motor Pool Main Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />August 2021 <br />B. Notify the Engineer and Owner of suspected or observed damage/clogging of drainage leaders <br />not already identified. <br /> <br />C. Demolish indicated areas in an orderly and careful manner. Protect existing structural members. <br /> <br />D. Inspect existing roof deck where exposed. Notify Owner/Owner’s representative of areas of <br />deteriorated or damaged deck. <br /> <br />E. The Owner’s representative or Designer and Contractor shall document the actual quantity of any <br />estimated quantity allowance work used. If the Owner’s representative or Designer is not <br />available, a photograph of the material to be replaced must be taken and the material set aside for <br />observation. The Contractor shall not be reimbursed for any material not verified properly. <br /> <br />F. Deck or substrate confirmed to be damaged shall be replaced or repaired prior to installing new <br />roof system. Replace damaged deck or substrate with new material of profile, size and type to <br />match existing as closely as possible. <br /> <br />G. Do not remove more existing roof system materials than can be replaced with new materials to a <br />watertight condition by the end of the same workday. Contractor shall have ready necessary <br />temporary protection from weather at all areas of demolition to protect interior of building from <br />elements in the event of unexpected inclement weather. <br /> <br />H. Cease operations and notify the Owner immediately if adjacent buildings, finishes, or structures <br />appear to be endangered. Do not resume operations until corrective measures have been taken. <br /> <br />I. Clean all dust and debris from the exposed substrate. Debris will not be allowed to accumulate <br />on the roof surface and must be removed from the roof daily. Material and debris shall be <br />transported to and from the roof by crane, hoist, or forklift unless otherwise approved by the <br />Engineer or Owner. If crane is used, it shall be operated by a certified crane operator. <br /> <br />J. Provide wind screens or other protection as necessary to prevent windblown debris from the roof <br />surface or from dumpsters. <br /> <br />K. Drag a magnet on the ground daily to remove the fasteners and metal pieces. Dispose of all <br />debris daily. <br /> <br />L. Debris must be removed from the site daily unless enclosed by a dumpster, trailer, or other sided <br />container that can be covered if necessary to prevent blowing debris. Do not stockpile materials <br />on the site unless agreed upon with the Owner’s representative. Do not burn or bury materials on <br />site. <br /> <br />M. Contractor shall have all potential repair materials on site prior to start of demolition to avoid <br />delay in repairs. <br /> <br />N. Estimated quantities of work are included in the Base Bid per Section 012100 for existing <br />components that may require repair/replacement. At project completion, or completion of <br />particular project milestones, the actual quantities work performed will be compared with the <br />estimated quantities to determine if changes to the contract sum (addition or deduct) may be <br />DocuSign Envelope ID: 9514E4EC-C3C9-4752-8A7F-22E83B22BB8E
The URL can be used to link to this page
Your browser does not support the video tag.