<br /> <br />024110.3 – SELECTIVE DEMOLITION <br /> <br />Project Manual for Motor Pool Main Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />August 2021 <br />G. The Contractor shall not load more materials on the roof than can be installed that day, unless <br />otherwise approved by the Owner or Owner’s represented. Materials shall be distributed and not <br />stacked. <br /> <br />PART 2 PRODUCTS <br /> <br />NOT USED <br /> <br />PART 3 EXECUTION <br /> <br />3.01 PRE-JOB DAMAGE SURVEY <br /> <br />A. Contractor shall perform a pre-job damage survey of the existing rooftop and site components <br />including roof, building exteriors, walkways, pavers, pavements, site features, landscaping, grass, <br />and building interior finishes to document existing damaged conditions prior to beginning work. <br />It is recommended that the Contractor coordinate with the Owner’s representative to have the <br />current working condition of any equipment associated with the roofing system as a part of the <br />Pre-Damage Survey. <br /> <br />B. Contractor shall submit required documentation, including either videotape footage of the survey <br />and/or photographs and sketches, as necessary to adequately describe existing conditions and to <br />allow for the location of noted defects. If no time stamp is provided on documents, it is critical <br />that the Contractor submit the Pre-Job Damage Survey to the Engineer prior to the start of work. <br />Video of the existing conditions is acceptable as long as the footage is narrated to describe <br />conditions observed and footage is taken at the proper distance and focus to make described <br />conditions visible. <br /> <br />C. It shall not be the responsibility of the Owner and/or Engineer to review or approve the contents <br />of the Contractor’s Pre-Job Damage Survey. The contractor may request that the Engineer or <br />Owner accompany them to observe a specific condition if there are questions or adequate <br />documentation by video or photographs may not be feasible. <br /> <br />D. The Contractor shall be responsible for repair or replacement of materials that are damaged <br />during construction activities and were not documented within the Pre-Job Damage Survey to <br />have been damaged prior to beginning the work. Items/materials that are damaged shall be <br />returned to the condition they were in prior to construction activities. If return to pre-construction <br />condition is not possible/practical, Contractor shall replace item/material with new to the <br />satisfaction of the Engineer and Owner. <br /> <br /> <br />3.02 DEMOLITION <br /> <br />A. Water test underground drain lines (as applicable) in conjunction with the Pre-Job Damage <br />Survey. The purpose of the test is to confirm that water flows freely from the downspouts into <br />the drain lines without evidence of clogging, or backup prior to the start of demolition work. <br /> <br />DocuSign Envelope ID: 9514E4EC-C3C9-4752-8A7F-22E83B22BB8E