Browse
Search
2021-563-E-AMS-Stewart-Cooper-Newell Architectus-This change amendment is to provide additional design services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-563-E-AMS-Stewart-Cooper-Newell Architectus-This change amendment is to provide additional design services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2021 10:04:29 AM
Creation date
10/13/2021 10:04:25 AM
Metadata
Fields
Template:
Contract
Date
10/11/2021
Contract Starting Date
10/11/2021
Contract Ending Date
10/12/2021
Contract Document Type
Contract Amendment
Amount
$391,072.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Cost proposal for additional work shall be accompanied by revised project scheduled changes, if schedule is impacted. <br />Failure to provide revised schedule will result in no changes to existing schedule. Schedule considerations are only <br />applicable to critical path items when no float time is available. Shared float time shall be assigned to proposed work <br />items per contract documents section 013200. <br /> <br />719 E. Second Avenue, Gastonia, NC 28054 P: 704-865-6311 F: 704-865-0046 <br />Cost provided shall include all labor, material, equipment, services and supplies. General Contractor and/or subcontractor <br />shall perform all work in accordance with bid Documents and/or instructions provided by architect post bid. <br /> <br /> <br />October 5, 2021 <br /> <br />Orange County - Asset Management Services <br />300 West Tryon Street | Bldg. B 3rd Floor Office 10 <br />Hillsborough, NC 27278 <br /> <br />Attn: Angel Barnes <br /> Capital Projects Manager <br /> <br />Re: Orange County EMS and Morgue – Fee Amendment <br /> <br />Due to conflicts between the Orange County UDO (outdated) and the State General Statutes regarding <br />Low Impact Development exemptions for Storm Water Management additional calculations/drawings <br />will be required. NCDOT is also requiring a storm water analysis of an existing drainage pipe servicing <br />the site for 25-50 year storm water events. <br /> <br />To facilitate additional services to the project scope Stewart Cooper Newel is requesting a fee <br />amendment to cover the additional calculations, redesign and drawings: <br /> <br />Our proposed fee to perform additional work is as follows: <br /> <br />· Revised Site Plan <br />o Civil, Architectural, Structural and PME revisions to Working Drawings: $10,620 <br /> <br />Please let us know when this approved and will proceed diligently to make the revisions so that we <br />can proceed with the project. <br /> <br />Thank you, <br /> <br />Sincerely, <br /> <br />James R. Stumbo, AIA <br /> <br /> <br /> <br />DocuSign Envelope ID: D7CED5F6-5536-491E-928D-7850F74B4726
The URL can be used to link to this page
Your browser does not support the video tag.