Orange County NC Website
Ordinance to Public Hearing <br />13 <br />~..f CJ <br />(3) Where sewage disposal within all or a portion of a <br />subdivision is to be accomplished through the installation <br />and use of surface sewage disposal systems, the plat shall <br />show the following form for Orange County Health <br />Department endorsement: <br />"Soil and site evaluations have been conducted by the <br />Orange County Health Department, Environmental Health <br />Division, and unless otherwise noted, an area on each lot <br />has been tentatively designated <br />" for the installation and repair of a <br />wastewater system. This certification is not an <br />Improvement Permit or an approval for a septic system <br />on any of the lots. Subsequent changes to the lots may <br />affect the ability to obtain Improvement Permits and/or <br />Construction Authorizations. <br />Environmental Health Specialist Date <br />(4) Where water and/or sewage disposal is to be provided <br />by a public or quasi-public entity the following <br />statement shall be certified by the person authorized to <br />represent the service provider: <br />"I hereby certify that the construction plans for the <br />water system and/or sewer system have been approved <br />for Name of Proiectl. The utilities have been <br />constructed, or secured via a Letter of Credit, to the <br />Service Provider standards. <br />[Authorized Signature] <br />Date <br />jAttest Signature] Date <br />SEAL <br />(5) a) Where a division of property is found to be exempt from <br />the provision of this Ordinance as specified in the definition <br />of "subdivision" in Article 2, the plat shall show the following <br />statements for Planning Department endorsement: <br />G:wrtentplanning/Robed/publichcaring2003/rinalplalstatementrevisions <br />