Browse
Search
Agenda - 11-24-2003-c3b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 11-24-2003
>
Agenda - 11-24-2003-c3b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:31:33 PM
Creation date
8/29/2008 10:36:07 AM
Metadata
Fields
Template:
BOCC
Date
11/24/2003
Document Type
Agenda
Agenda Item
c3b
Document Relationships
Minutes - 20031124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance to Public Hearing <br />November 24, 2003 <br />11 <br />~."1 <br />w <br />5) the frequency, modulation and class of service of <br />radio or other transmitting equipment; <br />6) the actual intended transmission and the maximum <br />effective radiated power of the antenna(s); <br />7) the direction(s) of maximum lobes and associated <br />radiation of the antenna(s); <br />8) certification that the NIER levels at the proposed <br />site are within the threshold levels adopted by the <br />FCC; <br />9) certification that the proposed antenna(s) will not <br />cause interference with other telecommunications <br />devices; <br />1 Q) a written affidavit stating why "the proposed site is <br />necessary for their communications service" (e.g,, for <br />coverage, capacity, hole-filling, etc.) and a statement <br />that there are no existing alternative sites within the <br />provided search area and there are no alternative <br />technologies available which could provide the <br />proposed service enhancement without the tower. <br />a) County staff will utilize the services of a registered <br />professional engineer to confirm t,`~ ct~t~^^~^' <br />aaade-in-.item-~absve substantive portions of <br />data provided in tower applications. No tower <br />shall be permitted to exceed its designed loading <br />capacity. For ali towers attached to existing <br />structures, the statement shall include Gertification <br />that the structure can support the load <br />superimposed from the tower, All towers shall have <br />the capacity to permit multiple users; at a minimum <br />monopole towers shall accommodate two (2) users <br />and self-support/lattice or guyed towers shall, at a <br />minimum accommodate three (3} users. <br />e) Standards of evaluation, <br />1) Tower height shall be measured from the base of <br />the tower to the highest point of the proposed <br />antenna(s), with lightening rod, to be located atop <br />the tower structure, <br />2) Telecommunications towers shall conform with all <br />of the requirements of Sections 8.8,17a.1a (a-g) <br />and 8,8.17a.2 of the Zoning Qrdinance. <br />G/curplannin@/RoberUtelcotowersroundtwo/tclcomm towers amendments Sec 6 sec 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.