Browse
Search
Agenda - 11-24-2003-c3b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 11-24-2003
>
Agenda - 11-24-2003-c3b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:31:33 PM
Creation date
8/29/2008 10:36:07 AM
Metadata
Fields
Template:
BOCC
Date
11/24/2003
Document Type
Agenda
Agenda Item
c3b
Document Relationships
Minutes - 20031124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance to Public Hearing 10 <br />r% ~ November 24, 2003 <br />M <br />6.18.4 Minimum Standards for Telecommunications Towers <br />All telecommunications towers must meet the following minimum <br />standards: <br />a) Prior to the issuance of a Building/Electrical Permit by the <br />Inspections Division, a site development plan shall be <br />presented for approval to the Planning Division. Each <br />application for a proposed telecommunications tower shall <br />include all requirements for site development plan approval <br />as required. Approval of the Planning Director or his/her <br />designee to verify consistency with the definition of stealth <br />facility is required. Each application shall contain a <br />rendering or photograph of the tower including, but not <br />limited to, colors and screening devices. <br />b) All telecommunications towers shall be placed in heavily <br />wooded areas on the site to the maximum extent possible <br />so as to lessen the visual intrusiveness of the structure and <br />accessory structures. A statement shall be submitted by <br />the applicant stating how the proposed tower will tae <br />minimize visual intrusiveness <br />to surrounding properties in the area. Criteria that may be <br />used for such evidence may be height and type of existing <br />trees surrounding the proposed tower, and local <br />topography. <br />c) A statement shall be submitted, prepared by a professional <br />engineer licensed in the State of North Carolina, which <br />through rational engineering analysis, certifies the tower's <br />compliance with applicable standards as set forth in the <br />State of North Carolina Building Code, and any associated <br />regulations; and describes the tower's capacity, including <br />an example of the number and type of antennas it can <br />accommodate. <br />d) Applicants shall provide at time of application submittal: <br />1) the existing cell sites (latitude, longitude, power levels) <br />to which this proposed site will be a handoff candidate; <br />~ propagation studies of the proposed site and all <br />adjoining planned, proposed, in-service or existing <br />sites; <br />, e-prspesed~lte <br />3) the search area utilized in finding the proposed site; <br />4) the make, model and manufacturer of the tower <br />and antenna(s), antenna heights and power levels of <br />proposed site; <br />G/cutplanning/Robert/tetcotowersmundtwo/telcomm towers amendments Sec 6 sec 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.