Browse
Search
Agenda - 11-24-2003-c3b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 11-24-2003
>
Agenda - 11-24-2003-c3b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:31:33 PM
Creation date
8/29/2008 10:36:07 AM
Metadata
Fields
Template:
BOCC
Date
11/24/2003
Document Type
Agenda
Agenda Item
c3b
Document Relationships
Minutes - 20031124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY BOARD OF COMMISSIONERS <br />AND ~~~ <br />PLANNING BOARD <br />PUBLIC HEARING AGENDA ITEM ABSTRACT <br />Meeting Date: November 24, 2003 <br />Action Agenda <br />Item No. C.3.b <br />SUBJECT: Telecommunications Towers Regulations Amendments <br />DEPARTMENT: Planning and Inspections PUBLIC HEARING: (YIN) Yes <br />ATTACHMENT(S): INFORMATION CONTACT: <br />Proposed Ordinance Craig N. Benedict, Ext. 2592 <br />Robert P. Davis, Ext. 2580 <br />TELEPHONE NUMBERS: <br />Hillsborough 732-8181 <br />Chapel Hill 968-2700 <br />Durham 688-7331 <br />Mebane (336)227-2031 <br />PURPOSE: To bear staff report and to receive public comment on proposed Telecommunication <br />Towers amendments to Article 6.18 and Article 8.8,17a of the Orange Gounty Zoning Ordinance. <br />BACKGROUND: On December 12, 2002 the BOCC amended the Telecommunication Tower <br />portion of the zoning ordinance, Highlights of those amendments included reduction to 150 <br />maximum height of Class B Special Use Permit (SUP) approvals, hiring a consultant to review the <br />technical details of proposals, placing a higher emphasis on use of existing structures and the <br />establishment of a Master Telecommunication Plan (MTP) placeholder in the ordinance. During <br />recent review of four Class B, Sl.)P telecommunications tower applications by the Board of <br />Adjustment some minor inconsistencies in the ordinance have become apparent to applicants, the <br />Board and Staff, the consultant and attorneys. These amendments are intended to clarify the parts <br />of the ordinance where there has been less than a clear understanding of the requirements, Also <br />included in these amendments is a revision of the intent, scope and use of the Master <br />Telecommunications Plan (MTP) concept that was previously adapted as a placeholder in the <br />ordinance pending BOCC review and approval, <br />Proposed amendments to Article 6.18 (Telecommunication Towers and Equipment) and Article <br />8,8,17a (Telecommunication Towers) to require: <br />1, at the Annual Telecommunications Projection Meeting that the applicant's initial propagation <br />studies begin with co-locations on existing strictures and then follow the preferred hierarchy; <br />2. photo simulations to be submitted at time of application; <br />3. balloon photos and panorama photos to be filed at time of application; <br />4. payment of $1,000,00 into the escrow account at pre-application meeting to cover fees <br />
The URL can be used to link to this page
Your browser does not support the video tag.