Browse
Search
Agenda - 10-05-2021; 8-h - Updates to the Assistance Policies for the 2021 North Carolina Housing Finance Agency (NCHFA) Urgent Repair Program (URP21)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2021
>
Agenda - 10-05-2021 Virtual Business Meeting
>
Agenda - 10-05-2021; 8-h - Updates to the Assistance Policies for the 2021 North Carolina Housing Finance Agency (NCHFA) Urgent Repair Program (URP21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2021 3:43:14 PM
Creation date
9/30/2021 3:37:09 PM
Metadata
Fields
Template:
BOCC
Date
10/5/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-h
Document Relationships
Agenda for October 5, 2021 Board Meeting
(Attachment)
Path:
\BOCC Archives\Agendas\Agendas\2021\Agenda - 10-05-2021 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> ORANCE{?UNTY HOUSING&(OMNIU'NITY DEVELOPMENT <br /> Bids must include a cost-per-item breakdown with line item totals equaling the submitted bid price.Any <br /> discrepancies must be reconciled prior to a contract being awarded. <br /> The County reserves the right to reject any or all bids at any time during the procurement process. <br /> In the event of an emergency situation,the County reserves the right to waive normal procurement <br /> procedures in favor of more expedient methods, which may include seeking quotes and bids by telephone, <br /> email,fax and the like. Should such methods ever become necessary the transaction, including the nature <br /> of the emergency, will be fully documented and placed in the project file. In the event telephone bids are <br /> used,the County will call the next eligible contractor on the Approved Contractor Registry who has <br /> indicated a desire to be on the Emergency Call List. The County will track who has been called and been <br /> responsive and will rotate through the Emergency Call List before beginning the rotation again. <br /> All sealed bids will be opened publicly at a date,time, and venue specified in the bid invitation. All bidders <br /> are invited and welcome to attend. Within 72 hours of the bid opening, after the review of bid breakdowns <br /> and construction schedules,the winning bidder(s) will be selected.All bidders and the homeowner will be <br /> notified in writing of the selection of the winning bid, the amount of the winning bid, and the specific <br /> reasons for the selection if the lowest bidder was not selected. <br /> The contractor is responsible for obtaining a building permit for the project before beginning work.The <br /> permit must be posted at the project site during the entire period of construction. If applicable,the <br /> contractor will obtain a permit for lead and/or asbestos hazard-related activities.The Rehabilitation <br /> Specialist will closely monitor the construction to make sure that the work is being done according to the <br /> work write-up (which is made part of the contract by reference) and in a timely fashion. Local code <br /> enforcement officials will, if required, inspect the work for compliance with the NC State Building Code and <br /> the local minimum housing code, when applicable.The homeowner will be responsible for working with <br /> the contractor to clear their personal property from the work areas as needed, as much as practicable.The <br /> contractor will be responsible for all clearing and cleaning activities necessary due to construction. <br /> Any change to the original scope of work must be in writing in the form of a change order to be agreed <br /> upon and signed by all parties to the original contract and two representatives of the County.The change <br /> order must detail any changes to the original contract price. <br /> No work may begin prior to a contract being awarded and executed and a written order to proceed <br /> provided to the contractor.A pre-construction conference and a walk through of the project site must also <br /> be held prior to the commencement of the project.At this time,the homeowner, contractor, and <br /> Rehabilitation Specialist will discuss the details of the work to be completed. Project start and end dates <br /> will be finalized, along with any special arrangements such as weekend or evening work hours and the <br /> disposition of items to be removed from the home. Within 24 hours of the pre-construction conference, <br /> the County will issue a "proceed order" formally instructing the contractor to commence work by the <br /> agreed upon date. <br /> Orange County is an equal opportunity employer, implements non-discriminatory practices in its <br /> procurement and disbursement and will make special outreach efforts to include Minority/Women <br /> Business Enterprise (M/WBE) businesses within its contractor and subcontractor pool. Contractors will be <br /> chosen by the above criteria without regard to race, color, national origin, disability, religion, age, <br /> sex/gender, sexual orientation, gender identity and expression, marital status or veteran status. <br /> Orange County Urgent Repair and Housing Rehab Procurement and Disbursement Policy Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.