Browse
Search
2021-525-E-AMS-Sasser Companies-Emergency Svc clean up sewage from backup and replace drywall carpet etc
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-525-E-AMS-Sasser Companies-Emergency Svc clean up sewage from backup and replace drywall carpet etc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2021 2:34:35 PM
Creation date
9/27/2021 2:34:09 PM
Metadata
Fields
Template:
Contract
Date
9/24/2021
Contract Starting Date
9/24/2021
Contract Ending Date
9/27/2021
Contract Document Type
Agreement
Amount
$13,786.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Sasser Restoration <br />PO BOX 10, Whitsett, NC 27377 <br />Office: 844.449.1144 | Fax: 336.449.1151 <br />OC_EMS_SEWAGE 9/23/2021 Page: 5 <br />CONTINUED - Locker Room Bathroom <br />DESCRIPTION QTY REMOVE REPLACE TOTALTAXO&P <br />Clean more than the floor - Heavy 158.83 SF 0.00 0.66 0.11 22.03 126.97 <br />Apply plant-based anti-microbial agent 158.83 SF 0.00 0.28 0.54 9.45 54.46 <br />to more than the floor <br />Dehumidifier (per 24 hour period) -3.00 EA 0.00 105.58 0.00 66.51 383.25 <br />XLarge - No monitoring <br />Neg. air fan/Air scrub.-Large (per 24 hr 3.00 DA 0.00 105.00 0.00 66.15 381.15 <br />period)-No monit. <br />Fog with an anti-microbial agent 894.67 CF 0.00 0.06 0.00 11.28 64.96 <br />Totals: Locker Room Bathroom 0.66 241.50 1,391.55 <br />Lobby <br />Lobby Bathroom <br />Kitchenette (1) <br />Hallway <br />Locker Room BathroomLocker Room <br />Lobby <br />Lobby Bathroom <br />Kitchenette (1) <br />Hallway <br />Locker Room BathroomLocker Room <br />11' 10"12' 6"19' 2" <br />19' 8"3'2' 9"6' 1"5' 10"4"13' 4" <br />Locker Room Height: 8' <br />457.11 SF Walls <br />683.92 SF Walls & Ceiling <br />25.20 SY Flooring <br />62.00 LF Ceil. Perimeter <br />226.81 SF Ceiling <br />226.81 SF Floor <br />56.17 LF Floor Perimeter <br />Missing Wall - Goes to Floor 5' 10" X 6' 8"Opens into Exterior <br />DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL <br />Water extraction from hard surface 60.00 SF 0.00 0.74 0.00 9.32 53.72 <br />floor - Cat 3 water <br />Containment Barrier/Airlock/Decon.40.00 SF 0.00 0.81 0.38 6.88 39.66 <br />Chamber <br />Peel & seal zipper - heavy duty 1.00 EA 0.00 15.83 0.84 3.49 20.16 <br />Containment Barrier - tension post -6.00 DA 0.00 3.30 0.00 4.16 23.96 <br />per day <br />Remove Locker - 12" wide x 60" high 4.00 EA 33.12 0.00 0.00 27.82 160.30 <br />x 15" deep <br />Tear out baseboard and bag for 13.00 LF 0.88 0.00 0.16 2.44 14.04 <br />disposal - up to Cat 3 <br />Tear out wet non-salv. gluedn. cpt,60.00 SF 1.38 0.00 0.24 17.44 100.48 <br />cut/bag - Cat 3 water <br />Floor prep (scrape residue)60.00 SF 0.00 0.49 0.00 6.17 35.57 <br />Tear out wet drywall, cleanup, bag, per 9.00 LF 4.50 0.00 0.04 8.51 49.05 <br />LF - to 4" - Cat 3 <br />HEPA Vacuuming - Detailed - (PER 69.00 SF 0.00 0.79 0.00 11.45 65.96 <br />SF) <br />Clean the surface area - Heavy 69.00 SF 0.00 0.66 0.05 9.58 55.17 <br />Apply plant-based anti-microbial agent 69.00 SF 0.00 0.28 0.23 4.11 23.66 <br />to the surface area <br />DocuSign Envelope ID: 3265F4F5-75D8-434A-90B9-B0426291EAF7
The URL can be used to link to this page
Your browser does not support the video tag.