Scope of Work <br />Siemens will provide the following: <br />General Project Scope: <br />- Provide Project management and technical labor for coordination, material sizing and procurement, <br />programming and graphics as needed, testing and check-out <br />- Provide particle count readings after units are installed on each floor and outside (Note - typically pre- <br />installation readings are provided as well, however the Detention Center is currently under construction with <br />associated construction conditions such as added dust/dirt and extra outside air infiltration.) <br />- Engineered updated As-Built panel lay-out drawings <br />- One year warranty on material and labor <br />Detention Center <br />1.Provide and install coil mounted Needle Point Bipolar Technology for the (5) Aaon RTUs serving the Area <br />'B' section of the Building. These units include RTU-3,4,5,6 & 7. <br />2. Tie-in dry contact from these 5 units to Siemens system to monitor operational readiness of unit. These <br />will be points will be wired from each unit to the bank of the control panel room in the central part of the <br />building. Available points will be utilized at the existing unit controllers. <br />3. Provide and install fan/duct mounted Needle Point Bipolar Technology at 17 HP Water-Source Heat Pumps <br />serving the Area 'A' section of the Building. <br />4. Tie-in dry contact from these 17 units to Siemens system to monitor operational readiness of unit. These <br />will be points will be wired from each unit to the local HP controller. Available points will be utilized at the <br />existing unit controllers. <br />Exclusions & Clarifications <br />1. All work conducted during normal working hours, from 8am to 5pm Monday through Friday. We will have <br />to temporarily shut down AHU operation for safe installation. If Orange County prefers to perform the work <br />after normal working hours, an option for Afterhours/Weekend work is provided. <br />2. All power will be pulled from local power source. <br />3.Due to COVID-19 impacts, to this work is subject to potential labor and material delays which are out of <br />our control. <br />4.While the technologies presented in this proposal have been lab tested against several viruses and other <br />airborne contaminants, they have not been field tested by Siemens in an uncontrolled environment against <br />Covid-19. The manufacturer(s) have provided results showing their effectiveness against many similar viruses <br />and other airborne contaminates, but Siemens provides no assurance independent of the manufacturers. <br />5.Pricing subject to change after 30 days. <br />Page 6 of 12 <br />DocuSign Envelope ID: EF0EBAEB-5D22-4296-B73B-B19BFA9A921F