Browse
Search
Agenda - 11-24-2003-c1a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 11-24-2003
>
Agenda - 11-24-2003-c1a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 3:57:17 PM
Creation date
8/29/2008 10:36:02 AM
Metadata
Fields
Template:
BOCC
Date
11/24/2003
Document Type
Agenda
Agenda Item
c1a
Document Relationships
Minutes - 20031124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
ORD-2003-142 PD-1-03 State Employees Credit Union Addition Special use permit
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />STATE OF NORTH CAROLINA 007 <br />DEPARTMENT OF T�ANSPORTATION <br />JAmEs 1 EH UNTJP. I�MSION OF HIGHWAYS GARLIND B, GARRZIT JPL <br />P. O. BOX 766 SECRETARY <br />Graham, North Carolina 27253 -0766 <br />16 September 1997 <br />ORANGE COUNTY <br />Eddie Kirk <br />Orange County Planning Department <br />306F Revere Road <br />Hillsborough, NC 27278 <br />919 732 - 81.81 E %T 2580 <br />SUBJECT: Final Plan Review: State Employees Credit Union <br />(Hillsborough) <br />Dear Mr. Kirk: <br />This office has completed its review of the subject's proposed <br />final plans for compliance with current Department of Transportation <br />minimum construction standards. We wish to advise that the final <br />Plans received at this office on 12 September 1997 are under standby <br />status awaiting revisions. Pursuant to any approval, this office <br />will require the owner /developer to meet the following requirements <br />before starting any construction. <br />1. Prior to any construction of any new access or alteration of any <br />existing access within the right of way, the developer /owner is <br />required to secure a permit with this office. It is the <br />responsibility of the owner /developer to obtain a permit. <br />2. During the construction, it is the responsibility of the <br />owner /developer to provide verification certifying that the <br />roadway surface, drainage, and seeding satisfies the approved <br />design outside the State's right of way. <br />3. When working within the State's right of way, the <br />owner /developer will contact the Graham District Office before <br />each of the following phases: (A) Drainage, (B) Grading, (C) <br />Placement of base, (D) Paving, and (E) Seeding. Failure to <br />notify this office before each phase of construction may justify <br />a verification certified and signed by a professional engineer. <br />5. any area within the State's right of way and /or easements <br />disturbed during the construction and /or maintenance shall be <br />repaired to the satisfaction of the District Engineer or his <br />representative. <br />mmi <br />
The URL can be used to link to this page
Your browser does not support the video tag.