Browse
Search
Agenda - 11-24-2003-c1a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 11-24-2003
>
Agenda - 11-24-2003-c1a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 3:57:17 PM
Creation date
8/29/2008 10:36:02 AM
Metadata
Fields
Template:
BOCC
Date
11/24/2003
Document Type
Agenda
Agenda Item
c1a
Document Relationships
Minutes - 20031124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
ORD-2003-142 PD-1-03 State Employees Credit Union Addition Special use permit
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-00 TEU 11.08 FA% 919 941 9006 OBRIEN /ATKINS IM 006 <br />.._; :2rcnaa 14:1( y19- 672 -3921 RAMEY KEMP & ASSDC PAGE H3/03 <br />Page 2 <br />Mr. Jonathan Parsons <br />November 12, 2003 <br />J 1 <br />The site plan indicates a stub -out will be provided along the southern boundary of the <br />property to provide intercounectivity for future development, When future development <br />occurs, it is recommended to provide stop control on the future development connection <br />and the SECTJ internal roadway such that the inbound traffic from Old NC 86 has the right - <br />of -way. This should prevent inbound traffic from queuing back from the site driveway <br />onto Old NC 86. <br />A Traffic Impact Analysis (TIA) report was prepared by Kimley -Horn and Associates, Inc. <br />?J�, z11 study intersections were expected to operate at acceptable levels of service under <br />p.m. peak hour build out (1998) conditions. Unless significant traffic growth has occurred <br />in the study area sincc 1998, all study intersections would be expected to operate at <br />acceptable levels of service in 2003 with the expansienlrenovations to the existing site. <br />Although it is anticipated that the SECU expansion and additional drive - through window <br />will increase traffic generated by the site, the increase in traffic is not expected to be <br />significant. <br />Please note that these comments are based on a preliminary review of the site plan and are <br />not based on our analysis results. A more detailed analysis of the trip generation and <br />,,atersection operations would be necessary to validate the preceding comments and <br />observations. <br />If you have any questions, please Contact me at (919) 872 -0180 x 110. <br />Sincerely, <br />RAMEYKEM„P & ASSOCIATES, 'NC' <br />Rynal G. Stephenson, P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.