Orange County NC Website
3 V <br />B. STATE PERMITS REQUIRED <br />1. Does the project involve the mining of earth products? <br />WIA/F, <br />If so, how many cubJ-9 feet of material are expected to be <br />excavated? __ — <br />Has an application for a Mining Permit been submitted to <br />NCDRCD? l i — <br />Please attach map indicating expected extent of proposed <br />2. Does the project involve generation or storage of <br />hazardous or toxic wastes, as identified by the <br />Environmental Protection Agency? (A listing of all <br />hazardous materials is available from the Planning <br />Department) &0 � <br />Describe the wastes to be generated. <br />How much material is expected to be generated per month? <br />Will any material be treated onsite? <br />Volume? <br />Will any material be stored onsite? <br />Volume? <br />Where will disposal of the material take place? <br />How will materials be transported to the disposal site? <br />What measures are proposed to protect water quality and <br />air quality in case of spills? <br />