Browse
Search
2021-493-E-AMS-Stickland Waterproofing Company-Eno River Parking Deck Repairs
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-493-E-AMS-Stickland Waterproofing Company-Eno River Parking Deck Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 9:03:04 AM
Creation date
9/14/2021 9:01:57 AM
Metadata
Fields
Template:
Contract
Date
9/8/2021
Contract Starting Date
9/8/2021
Contract Ending Date
9/14/2021
Contract Document Type
Contract
Amount
$129,461.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 6 <br /> <br />b. M2 – Mapeflex PU40 NS is a one-component NON Sag polyurethane sealant for the Perimeter joint sealant <br />repairs <br />c. M3 – Mapeflex PU40 NS is a one-component NON Sag polyurethane sealant for the Column and Wall <br />joint sealant repairs <br /> <br />REQUEST No. 3 RESPONSE: <br />The products submitted in the email below are acceptable. For simplicity, I have tabularized the alternates below: <br /> <br />Specified Product Approved Alternate Applicable Repair Detail(s) <br />Sikaflex-1c SL Mapeflex PU50 2A <br />Armatec 110 EpoCem Planibond 3C 3A, 3B, 3C <br />SikaTop-122 Plus MapeCem 202 3B <br />SikaTop-123 Plus Planitop XS 3A, 3B, 3C <br />Sikadur-55 SLV Epojet LV 3D <br />Sikalastic Primer <br />Sikalastic-710 <br />Sikalastic-715 LoVOC <br />Mapefloor PU Primer <br />Mapefloor PU 400 <br />Mapefloor Finish 450 <br />M-1 <br />Sikaflex-1c SL Mapeflex PU40 NS M-2, M-3 <br /> <br /> <br />Questions and Responses: <br />1. Since there will be NO hot work we do not need to take the training correct? <br /> <br />Answer: This is correct. The training is only required if HOT WORK will be <br />performed. <br /> <br />2. For Alternate M1 – Would we have the entire 38,100 SF at once to complete the <br />Traffic Coating? If not is it still “Only 25% of each level” that we will get? <br /> <br />Answer: Contract shall have only 25% of each level to complete alternate M1. <br /> <br />3. Alternate M3 – this is exterior joints correct. <br /> <br />Answer: The contractor will need to reseal the joints on the exterior face of walls <br />and interior face at the columns. <br /> <br />Attachments: <br />1. Prebid Sign in Sheet <br />2. Form of Proposal Rev 1 <br />3. E-Verify Affidavit and Living Wage <br />4. Orange County Non-Discrimination Certification <br />DocuSign Envelope ID: DF7281DA-C0AC-405F-A002-0E0273700A07
The URL can be used to link to this page
Your browser does not support the video tag.