Orange County NC Website
Page 3 of 6 <br /> <br /> 8. For mailed bids, it is the contractor’s responsibility to ensure the bid arrives <br /> prior to the bid closing date and time. <br /> <br />III. Alternates / Allowances: <br /> <br />Alternates <br />Alternate Repair Item M-1 Deck Resurfacing <br />Alternate Repair Item M-2 Additional Construction Joint Repair M-1 <br />Alternate Repair Item M-3 Deck Perimeter Joint Sealant <br />Alternate Repair Item M-4 Seal Column & Wall Panel Joints <br /> <br />Allowances <br />None <br /> <br />IV. E-Procurement Vendors <br />E-Procurement rules WILL apply for Registered E-Procurement Vendors only. If <br />the low bidder is an E-Procurement Vendor, the owner will not be responsible for <br />any fees associated with the E-Procurement process incurred by the low bidder or <br />any subcontractor. Refer to Special Conditions Article 8. <br /> <br />V. Schedule: <br /> <br /> Notice to Proceed: anticipated August 1, 2021 <br /> Substantial Completion: October 15, 2021 or 75 calendar days <br />from the Notice to Proceed date. <br /> Final Completion: shall occur 30 days after Substantial Completion <br /> <br />VI. Liquidated Damages: <br />See Supplementary General Conditions: $500.00 each calendar day in excess of <br />the stated completion time. <br /> <br />VII. Examination of Bid Documents: <br />All Bidders are expected to fully examine and familiarize themselves with the <br />Drawings, Specifications and Existing Conditions. All Bidders should read the <br />scopes of the bid package. Any questions or clarifications should be directed to <br />the Orange County Project Manager. No allowances will be made after the bids <br />are received for any oversight due to failure to examine the documents. <br />DocuSign Envelope ID: DF7281DA-C0AC-405F-A002-0E0273700A07