Browse
Search
Agenda - 09-14-2021; 12-2 - Information Item – Memorandum Regarding Administrative Updates to the Eno River Voluntary Water Management Operations Plan (WMOP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 09-14-2021 Virtual Business Meeting
>
Agenda - 09-14-2021; 12-2 - Information Item – Memorandum Regarding Administrative Updates to the Eno River Voluntary Water Management Operations Plan (WMOP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2021 5:54:06 PM
Creation date
9/9/2021 5:55:04 PM
Metadata
Fields
Template:
BOCC
Date
9/14/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
12-2
Document Relationships
Agenda for September 14, 2021 Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 09-14-2021 Virtual Business Meeting
Minutes 09-14-2021 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> Outside Sources <br /> Water obtained from sources outside of the area designated <br /> as capacity use will not be limited under the Eno Capacity Use <br /> regulations. During periods of higher flows (over 10 cfs or <br /> 6 .452 MGD) , public water supply systems may take additional water <br /> from the Eno, provided that they have long-term contracts for <br /> obtaining an equal amount of water from outside the basin when <br /> the flow in the Eno drops. This type of adjustment will be <br /> evaluated on a case-by-case basis by the N.C. Division of Water <br /> Resources. <br /> Plan Administration <br /> Orange County will be responsible for notifying affected <br /> water users of levels at Lake Orange and of the reductions of <br /> water withdrawals as required by the Plan. <br /> Periodic Review and Changes <br /> Withdrawal allowances will be subject to review every 5 years <br /> or when changes have been made to current systems, storage, or <br /> supply sources. <br /> Plan Support <br /> Technical support, plan clarification, and approval of minor <br /> interim adjustments and modifications will be provided by the <br /> N.C. Division of Water Resources. <br />
The URL can be used to link to this page
Your browser does not support the video tag.