Browse
Search
Agenda - 09-14-2021; 12-2 - Information Item – Memorandum Regarding Administrative Updates to the Eno River Voluntary Water Management Operations Plan (WMOP)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 09-14-2021 Virtual Business Meeting
>
Agenda - 09-14-2021; 12-2 - Information Item – Memorandum Regarding Administrative Updates to the Eno River Voluntary Water Management Operations Plan (WMOP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2021 5:54:06 PM
Creation date
9/9/2021 5:55:04 PM
Metadata
Fields
Template:
BOCC
Date
9/14/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
12-2
Document Relationships
Agenda for September 14, 2021 Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 09-14-2021 Virtual Business Meeting
Minutes 09-14-2021 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> Instream Flow <br /> In addition to maximum withdrawal limits set for offstream <br /> uses in the Eno River Basin, minimum instream flow requirements <br /> are established at the Hillsborough streamflow gage (USGS <br /> Streamflow Gage # 02085000) . A minimum of 1 . 7 cfs (1 , 100, 000 <br /> gallons per day) is to be maintained at the gage when Lake Orange <br /> is greater than 80 percent total storage. This value is reduced <br /> as the storage level decreases at Lake Orange. Table 1 lists <br /> the minimum instream flow requirements. Orange County will be <br /> responsible for coordinating releases and maintaining minimum <br /> flows at the gage. The three major withdrawers will provide <br /> withdrawal schedules to the County at least one week in advance <br /> and will notify the County immediately regarding emergencies and <br /> other necessary changes in the withdrawal schedule. <br /> Additional Storage <br /> The withdrawal allocation can be revised whenever additional <br /> storage facilities are completed in the capacity use area or when <br /> additional water supplies are made available from sources outside <br /> the area. New storage facilities will be reviewed to ensure that <br /> there are no adverse effects upon the permit holders or on <br /> streamflow as measured at the Hillsborough gage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.