Orange County NC Website
8 <br /> Outside Sources <br /> Water obtained from sources outside of the area designated <br /> as capacity use will not be limited under the Eno Capacity Use <br /> regulations. During periods of higher flows (over 10 cfs or <br /> 6 .452 MGD) , public water supply systems may take additional water <br /> from the Eno, provided that they have long-term contracts for <br /> obtaining an equal amount of water from outside the basin when <br /> the flow in the Eno drops. This type of adjustment will be <br /> evaluated on a case-by-case basis by the N.C. Division of Water <br /> Resources. <br /> Plan Administration <br /> Orange County will be responsible for notifying affected <br /> water users of levels at Lake Orange and of the reductions of <br /> water withdrawals as required by the Plan. <br /> Periodic Review and Changes <br /> Withdrawal allowances will be subject to review every 5 years <br /> or when changes have been made to current systems, storage, or <br /> supply sources. <br /> Plan Support <br /> Technical support, plan clarification, and approval of minor <br /> interim adjustments and modifications will be provided by the <br /> N.C. Division of Water Resources. <br />