Browse
Search
Agenda - 11-20-2003-3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 11-20-2003
>
Agenda - 11-20-2003-3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:44:42 PM
Creation date
8/29/2008 10:36:00 AM
Metadata
Fields
Template:
BOCC
Date
11/20/2003
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes - 20031120
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i~ <br />r <br />2006-07 <br />• Distribute mml curbside bins and odditionnl <br />multifamily taro. Conduct education. <br />• Implement universal residential and multifamily <br />curbside recycling, Ywo-bin system (one for n1I <br />paper and one for all types of coos and bottles). <br />Service ail Accessible addresses. About 10%of <br />nual homes projected to be inaccessible. <br />• Multiftimily complexes use one or more groups of <br />roll cans nt each wmplex. <br /> <br />2006-07 (cont'd) <br />• All materials would be taken to tvIItF for <br />processing. <br />• tJNC regclables delivered to MRF beginning this <br />year (2,237 loos up to 2,354 toss projected <br />throug62010.11), <br />• Expect 6,320 loos increase io recycling due to <br />adding mixed paper ood alt wntainers to curbside <br />recycling. Includes some decrease nt dropoffsites. <br />• hire commercial recycling route supervisor and <br />plan routes, purchase carts and wcks <br />2007-08 <br />• Distribute commercial recycling containers <br />and conduct education. <br />• Institute first half of commercial recycling <br />routes including any business or other non- <br />residential entity in Orange County.. Project <br />9,540 tons of additional diversion. <br />• Two trucks would be purchased and drivels <br />hired. <br />r. <br />G <br />
The URL can be used to link to this page
Your browser does not support the video tag.