Browse
Search
OUTBoard Agenda Packet - 091521
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2021
>
OUTBoard Agenda Packet - 091521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 4:19:33 PM
Creation date
9/7/2021 4:18:18 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard Minutes - 091521
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br /> Future Protects: <br /> Horizontal Curve Improvements Old NC 10- Construction June 2022 <br /> Significant STIP Projects: <br /> Additional information available at https://www.ncdot.gov/initiatives- <br /> policies/Transportation/stip/Pages/about.aspx <br /> Current Proiects: <br /> U-6245- Economic Development Project- Construct turn lanes, paved shoulders and resurface <br /> SR 1146. West Ten Road and SR 1114 Buckhorn Road- Scheduled for completion August 20, <br /> 2021 <br /> EB-4707A—Old-Durham Rd (Orange County) to Pope Rd (Durham County) Construct Bike and <br /> Pedestrian Improvements—Under Construction- Completion May 2022 <br /> B-4962- Replace Bridge #46 US 70 East over the Eno River, (On-site detour to the north of <br /> existing bridge) Under construction- Bridge and roadway work complete and open to traffic. <br /> Collaborating with N.C. State Parks and other stakeholders on accommodation of Mountains to <br /> Seas Trail (MST) under the bridge. <br /> U-5846-Roundabout at Estes Drive at Greensboro Street—Construction is underway. — <br /> Roundabout opened to traffic July 2021. Completion scheduled for September 2021. <br /> Future Proiects: <br /> R-5821- Operational Improvements at various intersections on NC 54 From Old Fayetteville <br /> Road to Orange Grove Road- Orange Grove Road intersection complete-Additional <br /> intersections under evaluation and development- Construction June 2022 <br /> 1-3306AA and AB- 1-40 from 1-85 to Durham County Line- Widen to six lanes- Award Design Build <br /> Contract August 2021 <br /> 1-3306AC- 1-40 Interchange with NC 86- Interchange Improvements- Construction March 2022 <br /> 1-0305- 1-85 from Orange Grove Road to Durham County-Add lanes- Construction October 2028 <br /> 1-5984- 1-85 at NC 86- Upgrade interchange- Construction November 2025 <br /> 1-5958- 1-40/85 from Buckhorn Road to Orange Grove Road- Pavement rehabilitation- <br /> Construction November 2023 <br /> 1-5959- 1-85 from Orange Grove Road to Durham County- Pavement Rehabilitation- <br /> Construction November 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.