Browse
Search
2021-482-E-AMS-Sasser Companies-Emergency Services 510 meadlowlands drive warehouse remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-482-E-AMS-Sasser Companies-Emergency Services 510 meadlowlands drive warehouse remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 2:27:19 PM
Creation date
9/7/2021 2:25:32 PM
Metadata
Fields
Template:
Contract
Date
8/27/2021
Contract Starting Date
8/27/2021
Contract Ending Date
8/31/2021
Contract Document Type
Agreement
Amount
$190,587.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.O. Box 8181 * 300 West Tryon Street, 3rd Floor, Office 10 * Hillsborough, North Carolina 27278 <br />Telephone: 919 245-2625 <br />Fax: 919-644-3001 <br />E-mail : abarnes@orangecountync.gov <br />Page 2 of 2 <br /> <br />General Notes: <br />1. The medical supplies mentioned within the Report with Protocols for <br />Remediation have been removed from the warehouse under separate <br />contract with a professional remediation contractor. <br />2. The HVAC units referenced within the Report with Protocols for <br />Remediation as indicated are located on the west wall of the <br />warehouse. There are three HVAC units. The ductwork from these units <br />as been installed. These units do not have power therefore these units <br />cannot be started up at this time. See Attached Drawing M2.0 Edited <br />for exact location of HVAC units within the warehouse. Also shown on <br />page 13 of the Report with Protocols for Remediation. <br />3. The cooler and IT closet currently have protective tunnels leading to <br />each location. These rooms must remain accessible through out <br />construction unit such time that staff can enter the warehouse to <br />access these spaces. <br />4. Remediation Contractor is responsible for obtaining all necessary <br />permits to complete the scope of work. <br />5. Contractors shall review the dates listed on the pictures. The Report <br />with Protocols for Remediation was updated on August 4, 2021. <br /> <br /> <br />End of Addendum 1 <br /> <br />DocuSign Envelope ID: A9A4637A-BE59-4285-99BE-D253C29FA836
The URL can be used to link to this page
Your browser does not support the video tag.